Document Owner:

Drill & Blast Supt

Document Approver:

Operations Manager

WHITEHAVEN GROUP

Revision Period:

3 years

Issue:

7

Last Revision Date:

October 2022

WHC-PLN-TAR-BLAST MANAGEMENT PLAN

TARRAWONGA COAL MINE

BLAST

MANAGEMENT PLAN

Approval

Name

Position

Signed

Date

Document Owner:

Sam Payne

Drill and Blast Supt

October

2022

Authorised by:

Craig Sullivan

Operations Manager

October

2022

"If it's not safe, don't do it."

Page 1 of 33

UNCONTROLLED COPY WHEN PRINTED.

REFER TO INTRANET FOR LATEST VERSION

Document Owner:

Drill & Blast Supt

Document Approver:

Operations Manager

WHITEHAVEN GROUP

Revision Period:

3 years

Issue:

7

Last Revision Date:

October 2022

WHC-PLN-TAR-BLAST MANAGEMENT PLAN

Contents

1

INTRODUCTION

4

2

STATUTORY REQUIREMENTS

6

PA11_0047

6

2.1.1

BLAST MANAGEMENT PLAN

6

2.1.2

BLASTING CRITERIA

7

EPL 12365

10

OTHER STATUTORY REQUIREMENTS

11

3 BLASTING CONTROLS AND MANAGEMENT PROCEDURES

11

STRUCTURAL AND HUMAN IMPACTS

12

ABORIGINAL AND NON-ABORIGINAL HERITAGE

12

LIVESTOCK

13

MANAGEMENT OF ROAD CLOSURES

13

AIR VIBRATIONS (OVERPRESSURE)

13

GROUND VIBRATIONS

14

DUST AND OTHER POST-BLAST EMISSIONS

14

CUMULATIVE BLAST MANAGEMENT STRATEGY

16

4

INSPECTIONS AND NOTIFICATIONS

17

PRE- BLASTING INSPECTIONS

17

PRE-BLASTING NOTIFICATION

17

4.2.1

PUBLIC NOTIFICATION

17

4.2.2 LIAISON WITH ADJACENT MINES

17

5

MONITORING AND REPORTING

18

MONITORING PROGRAM

18

5.1.1 PARAMETERS MEASURED AND MONITORING FREQUENCY

18

5.1.2

MONITORING LOCATIONS

18

"If it's not safe, don't do it."

Page 2 of 33

UNCONTROLLED COPY WHEN PRINTED.

REFER TO INTRANET FOR LATEST VERSION

Document Owner:

Drill & Blast Supt

Document Approver:

Operations Manager

WHITEHAVEN GROUP

Revision Period:

3 years

Issue:

7

Last Revision Date:

October 2022

WHC-PLN-TAR-BLAST MANAGEMENT PLAN

5.1.3 BLAST FUME MONITORING AND REPORTING

....................................................

18

REPORTING

19

6 MANAGEMENT OF INCIDENTS, EXCEEDANCES, NON-COMPLIANCES AND COMPLAINTS 21

6.1.1

BLASTING RELATED INCIDENTS

21

6.1.2

BLASTING CRITERIA EXCEEDANCE

21

6.1.3

AGENCY NOTIFICATION

21

6.1.4

LANDHOLDER NOTIFICATION

21

6.1.5

POLLUTION EVENTS

21

6.1.6

COMPLAINTS

22

6.1.7

PROPERTY INVESTIGATIONS

22

6.1.8

UNFORESEEN IMPACT PROTOCOL

23

7

DEFINITIONS

24

8

SUPPORTING DOCUMENTATION

26

9

DOCUMENT REVIEW AND CONTINUOUS IMPROVEMENT

27

10

APPENDICES

28

APPENDIX 1: ROAD CLOSURE MANAGEMENT PLAN

29

APPENDIX 2: ENVIRONMENTAL BLAST CHECKLIST

32

"If it's not safe, don't do it."

Page 3 of 33

UNCONTROLLED COPY WHEN PRINTED.

REFER TO INTRANET FOR LATEST VERSION

Document Owner:

Drill & Blast Supt

Document Approver:

Operations Manager

WHITEHAVEN GROUP

Revision Period:

3 years

Issue:

7

Last Revision Date:

October 2022

WHC-PLN-TAR-BLAST MANAGEMENT PLAN

1 INTRODUCTION

The Tarrawonga Coal Mine (TCM) is located approximately 15 km northeast of Boggabri, 10km north of the Canyon Coal Mine (formerly Whitehaven, in closure) and south of, and adjacent to, the Boggabri Coal Mine (BCM) (Figure 1). The mine site is contained within Mining Lease (ML) 1579, ML 1693, ML 1685 and ML 1749 as shown in Figure 1. The mine site is being developed by Tarrawonga Coal Ltd (TCPL), which is owned by Whitehaven Coal Mining Pty Ltd.

The mine site operates under Project Approval (PA) 11_0047 (granted 22 January 2013), and has made 8 Modifications since this date. TCPL also operates under Environment Protection Licence (EPL) 12365.

This Blast Management Plan (BMP) has been prepared to ensure that the blasting associated with the mine's operations are in compliance with criteria stated in PA 11_0047. To ensure this, the BMP has been prepared in accordance with Condition 3(21) of PA 11_0047.

The following sub-sections identify the monitoring locations and the nature of the monitoring equipment to be used, equipment setup and post-blasting procedures as well as blast information analysis and reporting procedures.

The original BMP was prepared in consultation with the EPA and the Tarrawonga Community Consultative Committee (CCC).

Information regarding blast management and performance to date is available in the site's Annual Environmental Management Reports (AEMR)/Annual Reviews (AR).

"If it's not safe, don't do it."

Page 4 of 33

UNCONTROLLED COPY WHEN PRINTED.

REFER TO INTRANET FOR LATEST VERSION

Document Owner:

Drill & Blast Supt

Document Approver:

Operations Manager

WHITEHAVEN GROUP

Revision Period:

3 years

Issue:

7

Last Revision Date:

October 2022

WHC-PLN-TAR-BLAST MANAGEMENT PLAN

Figure 1: Tarrawonga Coal Mine Location

"If it's not safe, don't do it."

Page 5 of 33

UNCONTROLLED COPY WHEN PRINTED.

REFER TO INTRANET FOR LATEST VERSION

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Whitehaven Coal Limited published this content on 20 January 2023 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 24 January 2023 08:56:06 UTC.