Skanska has signed a contract with the
The scope of the project includes the replacement of the Livingston Avenue Bridge, including the addition of a movable two-track vertical lift railroad bridge over the
Additionally, the project includes the construction of control and machinery rooms; the installation of new railroad signals; the implementation of electrical infrastructure; and bridge and navigation lighting, realignment and improvements. Additional rail bridges will also be reconfigured and rehabilitated.
The new bridge will support higher-speed passenger and freight rail, as well as provide pedestrians and bicyclists safer and better access to cross the
Work commenced in
For further information please contact:
Direct line for media, tel +46 (0)10 448 88 99
This and previous releases can also be found at www.skanska.com.
https://news.cision.com/skanska/r/skanska-replaces-livingston-avenue-bridge-in-albany--ny--usa--for-usd-596m--about-sek-6-3-billion,c4013357
https://mb.cision.com/Main/95/4013357/2909425.pdf
(c) 2024 Cision. All rights reserved., source