Visible Gold Mines Inc. announced the final results from its Phase 2 'Wasa Creek/Wasa East' drilling program on the Corporation's Break project, west of Rouyn-Noranda, Quebec. The Wasa Creek 2012 drilling program is located approximately 3.0 kilometres southwest of Richmont Mines' 6.75 Mt (M+I) Wasamac project and was composed of 10 drill holes totaling 5,698 metres. The Wasa East drilling program was composed of 3 drill holes totaling 564 metres and is located 3.5 kilometres east of Wasamac.

Following encouraging results in the first phase of drilling, two subsequent drill programs were conducted. These utilized a core orientation system to better understand vein geometry. Results of the second phase produced mixed results, and the core orientation system proved difficult to use.

The third phase was much more successful in terms of results from the core orientation system, demonstrating that some mineralized zones strike about 165 degrees (NNW-SSE) and dip 30-35 degrees west. The oriented data provides a new perspective on the results obtained, such that future drilling will consider these structural complexities and will be testing extensions to known NNW-SSE zones as well as other linear features in the same orientation. At least two such magnetic lineaments, defined by a detailed magnetic survey conducted earlier by Cadillac Mining Corp., are now priority drill targets.

The Corporation has completed its phase 2 drilling program for a total of 8 holes and 2,982 metres on its Joutel gold project located in the Joutel township Province of Quebec. The first three holes (JO-12-01 to 03) located on the east side of the property cut many strongly altered gabbroic and felsic dykes or sills. These are overprinted by a conjugated set of quartz-carbonates veins.

A single spec of visible gold was seen in a quartz vein intersected at a depth of 65.2 metres in hole JO-12-03, within a 35.7 metres interval of a strongly hematitized and silicified felsic intrusion. Two additional drill holes (JO-12-07 and 08) located 960 and 1,200 metres north west of JO-12-01 also intersected many altered and mineralized zones. Three other drill holes (JO-12-04 to 06) totaling 1,190 metres were completed on each side of JO-11-06.

Over 1,300 samples have been sent to the laboratory at this moment.