Calgary, Canada: - Transeuro Energy Corp. ("Transeuro" or the "Company") announces that December gas production from the Beaver River field in Canada was 1,314,960m3 (average of 42,418m3 per day or 1.5 mmcf/d), compared to November production of 782,230m3 (average of 26,074 m3 per day or 0.9 mmcf/d).

Production during December was reduced for the first 10 days due to high pipeline pressures after the November plant shutdown that then constrained the field compressors, but has since returned to the long term trend.

ABOUT THE COMPANY
Transeuro is involved in the acquisition of petroleum and natural gas rights, the exploration for, and development and production of crude oil, condensate and natural gas. The Company owns 100% of a gas producing property located in British Columbia, Canada and has interest in gas exploration and appraisal developments in Crimea, Ukraine.

On behalf of the Board of Directors
Aage Thoen, Chairman

For further information contact:
Darren Moulds, IR, +1 403 705 1919
http://www.transeuroenergy.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor the Oslo Axess accepts responsibility for the adequacy or accuracy of this release. The statements contained in this release that are not historical facts are forward-looking statements, which involve risks and uncertainties that could cause actual results to differ materially from the targeted results. The Company relies upon litigation protection for forward looking statements.
distributed by