Tap Oil Limited provided the following update on the Inthanin-1 exploration well drilled in the G1/48 concession Manora Production License, operated by Mubadala Petroleum, in the Northern Gulf of Thailand (Tap 30% interest). The Inthanin-1 well spudded on 20 November 2019 and reached a total depth of 2528m on 24 November 2019. Target objectives in the well were intersected within 15m of p re-drill prognosed depths however no significant shows were encountered while drilling and evaluation of log data indicates no zones of interest in the well. While evaluation of the well results and reasons for the lack of hydrocarbons is ongoing, it is notable that the prognosed sandstone reservoir targets in the deeper "500" and "600" sand series were very poorly developed. The drilling of the Inthanin-1 well was completed ahead of schedule and below budget cost. Following completion of plug and abandon operations, the Ensco 115 jackup drilling rig will move to drill the Yothaka East-1 well. The Yothaka East-1 surface location is 6.0 km SE of the Manora Platform. The Yothaka East-1 well is expected to spud on Friday 29 November 2019. This well will test an independent structure to the Inthanin feature in an expected separate sand fairway.