Sitka Gold Corp. released assay results for the final drill holes of the 2022 diamond drill program completed at the Company's district-scale RC Gold Project ("RC Gold" or the "Project"), a 376 square kilometre contiguous land package with year-round road access located in the heart of Yukon's Tombstone Gold Belt (TGB). Gold assay highlights from this new release include: 201.0 m of 1.26 g/t Au from surface in DDRCCC-22-040, including: 82.0 m of 2.04 g/t Au from surface including; 19.5 m of 4.87 g/t Au from surface including; 2.0 m of 31.20 g/t Au from 16.0 m. 10.0 m of 0.60 g/t Au from 357.0 m in DDRCCC-22-039 and 12.0 m of 0.52 g/t Au from 336.0 m and 3.0 m of 0.97 g/t Au from 458.0 m. Drilling to date at the RC Gold Project has produced long intercepts with significant gold grades, as highlighted by Hole 40, and has confirmed the continuity of significant and persistent gold mineralization within the Blackjack zone to surface, which remains open in all directions and demonstrates significantly higher grades of gold mineralization within the intrusion host rock.

The majority of drilling to date at RC Gold was designed to provide the spatial requirements necessary to estimate an initial resource.