Sidus Space, Inc. has been selected by Bechtel Corporation to manufacture cables for the NASA Mobile Launcher 2 project. Sidus was previously awarded a contract to fabricate custom cables and populate unique electronics cabinets supporting the launch control subsystem and ground special power subsystems. Mobile Launcher 2 (ML2) is the ground platform structure that will launch Space Launch System (SLS) Block 1B and Block 2 configurations to the Moon, allowing the agency to send astronauts and heavy cargo to the lunar surface as part of NASA's Artemis program. ML2 is the primary interface between the ground launch control system and the SLS rocket and Orion spacecraft flight hardware.
End-of-day quote
Other stock markets
|
5-day change | 1st Jan Change | ||
2.76 USD | +0.36% |
|
+18.97% | -68.67% |
![Consensus](/images/consensus_flch.gif)
1st Jan change | Capi. | |
---|---|---|
-68.67% | 11.54M | |
+20.38% | 134B | |
+9.37% | 77.76B | |
-7.67% | 63.97B | |
+14.18% | 49.49B | |
+50.15% | 49.4B | |
+95.76% | 43.96B | |
+9.70% | 43.82B | |
+81.04% | 29.17B | |
+77.35% | 24.1B |
- Stock Market
- Equities
- SIDU Stock
- News Sidus Space, Inc.
- Sidus Space Wins Bechtel Cable Assembly Contract for Mobile Launcher 2