Sacgasco Limited advised that production and sale of natural gas from the Dempsey 1-15 well has commenced. The well is flowing high quality dry gas (997 Btu/scf) at a rate of approximately 140 mcf/day with a flowing tubing pressure of 670 pounds per square inch (psi). Concurrently the application process for the permitting of the enhanced reservoir stimulation of the well is proceeding as planned with field operations expected in the first quarter of 2018.