Progress in 2023
Completion of a detailed lithium targeting study on all its exploration projects located in the
and identification of high priority lithium targets over a surface area totalling 125 km2; Completion of a follow-up prospecting program leading to the discovery of the Ninaaskumuwin spodumene prospect on the Elmer East project and identification of drill targets (permit received). The discovery outcrop is about 1.3 km from the
Outlook for 2024
Lithium - At the Ninaaskumuwin spodumene discovery at Elmer East, perform a diamond drilling program that aims to test: 1) the down-dip extent of the sill of the discovery outcrop, and 2) the presence of potential stacked sills. In addition, carry out geological mapping in and around the discovery outcrop and collect additional structural measurements;
Gold - At the La pointe Extension deposit at Sakami, drilling of untested gold targets. To date, encouraging results from metallurgical testing, induced polarization survey and drilling programs have been received and indicate the presence of a significant mineral resource including many higher-grade areas and,
'With the progress made in 2023, 2024 is expected to be a transformative year for QPM and we continue with our exploration success to advance our lithium and gold projects', stated
About
QPM is primarily focused on advancing its Sakami gold project, located in Eeyou Istchee
Contact:
Chief Executive Officer
Tel: 514 979-4746
Email: nchampigny@qpmcorp.ca
(C) 2024 Electronic News Publishing, source