QMX Gold Corporation report the results from its on-going Bonnefond drilling program, on the Val d’Or East Zone of QMX’s extensive land package in Val d’Or, Quebec. These thirteen holes cover results from the first half of the on-going definition drilling program on the Bonnefond project. This program's goal is to support an initial resource estimate schedule for late Spring 2019. In the Tonalitic Plug (lengths are measured along the holes): Drill hole 17315-18-063 returned 1.97 g/t Au over 87.5m, including 3.31 g/t Au over 26.8m and 31.55 g/t Au over 1.6m. Drill hole 17315-18-067 returned 1.94 g/t Au over 143.7m, including 12.34 g/t Au over 8.1m. Drill hole 17315-18-072 returned 1.92 g/t Au over 147.6, including 5.11 g/t Au over 4.0m. Shear Zone in Volcanics (lengths are measured along the holes): Drill hole 17315-18-063 returned 9.01 g/t Au over 3.4m. Drill hole 17315-18-065 returned 11.95 g/t Au over 8.0m including 39.49 g/t over 2.4m, and 5.54 g/t Au over 1.4m, Drill hole 17315-18-069 returned 12.23 g/t Au over 3.2m and 4.35 g/t over 3.9m, Drill hole 17315-18-070 returned 7.20 g/t Au over 2.5m, Drill hole 17315-18-072 returned 1.69 g/t Au over 40.9m including 3.90g/t Au over 6.2m and 3.14 g/t au over 7.9m and Drill hole 17315-18-073 returned 6.06 g/t au over 5.0m. These results are part of a 50m x 50m infill drilling program on the western side of the Tonalite intrusion between the surface and 400m depth. This program successfully confirm and support the grades and the continuity of the mineralisation in the Bonnefond intrusive with intercepts returning 1.97 g/t Au over 87.5m, including 3.31 g/t Au over 26.8m and 31.55 g/t Au over 1.6m in drill hole 17315-18-063; 1.94 g/t Au over 143.7m, including 12.34 g/t Au over 8.1m in drill hole 17315-18-067 and 1.92 g/t Au over 147.6m in drill hole 17315-18-072. The average true width of the mineralized envelope is 60m and extends 300m east-west. QMX is currently drilling the last 2,500m of the definition drilling campaign to support an initial resource estimate scheduled for late Spring 2019. This program also confirmed the continuity and grade in the shear zones south of the Bonnefond intrusive close to surface. Results from this environment include 9.01 g/t Au over 3.4m in drill hole 17315-18-063 and 11.95 g/t Au over 8.0m including 39.49 g/t over 2.4m and 5.54 g/t Au over 1.4m in drill hole 17315-18-065. Drill hole 17315-18-072 intercepted 1.69 g/t Au over 40.9m including 3.90g/t Au over 6.2m and 3.14 g/t au over 7.9m in one of the shear zones to the north of the Bonnefond intrusion, increasing the potential in this area for the discovery of additional mineralized zones close to surface. QMX is currently drilling the last 2,500m of the definition drilling campaign to support an initial resource estimate scheduled for late Spring 2019.