Corporate Directory

ASX Code: POS

Shares on Issue: 2,638M

Market Cap: ≈$93M

Cash and investments at 31 December 2019

$51.6M

Board of Directors

Non-Executive Chairman

Derek La Ferla

Non-Executive Directors

Geoffrey Brayshaw

Felicity Gooding

Karl Paganin

Interim CEO

David Riekie

CFO & Joint Company Secretary

Brendan Shalders

Joint Company Secretary

Andrea Betti

Key Shareholders

Black Mountain Metals: 19.8%

Squadron Resources: 17.1%

Key Nickel Assets (100%)

Black Swan/Silver Swan

Lake Johnston

Windarra

Principal & Registered Office

Unit 8 Churchill Court

331-335 Hay Street

Subiaco 6008

Western Australia

    1. +61 8 6167 660
    1. +61 8 6167 6649
  1. admin@poseidon-nickel.com.au
  1. www.poseidon-nickel.com.au

QUARTERLY REPORT

31 DECEMBER 2019

HIGHLIGHTS

BLACK SWAN

RESTART STUDY

  • Poseidon management continued to progress the Black Swan restart study outcomes, key operational and financial drivers requiring further development

UNDERGROUND DRILLING

  • Successful completion of Black Swan underground RC drilling program
  • Results confirmed Open Pit provides exploration opportunity beyond current pit profile

SAFETY WORKS PROGRAMS

  • Processing facility safety works program completed on time and under budget (~$1.2m vs $1.4m)
  • Silver Swan escapeway ladder replacement and refurbishment activities continued without incident, remaining on track, within budget for completion during April 2020

WINDARRA

EXPLORATION UPDATE

  • Completion of 4,234m exploration drilling and assaying program for Crazy Diamond prospect

CORPORATE

  • Board and Management team strengthened with key appointments of Mr Derek La Ferla as Independent Non-Executive Chairman and Mr Peter Harold as Managing Director and Chief Executive Officer

Page 2

Poseidon Nickel (ASX: POS, "the Company") is pleased to report on its activities for the December Quarter 2019.

Interim CEO David Riekie commented, "We've made solid progress over the December 2019 quarter in respect to the Black Swan restart studies, associated safety works programs and have seen some positive drilling outcomes around Black Swan and Windarra."

"Management and the Board remain committed to ensuring the review process adopted for the Black Swan restart continues, to ensure the value drivers at an operational and technical level, benefit from further consideration and development, prior to the Board considering an investment decision."

"The Company will continue to develop those workstreams to progress the Black Swan restart to a state of readiness so we can move quickly in a stronger nickel market price environment."

BLACK SWAN RESTART STUDY

During the quarter the Company continued to progress the Black Swan restart study. This process has been constructive and identified a number of key drivers for a restart at Black Swan that require further consideration and development. The objective is to ensure those financial outcomes that emanate from the study will also enable a longer-term production profile.

The timing of an investment decision on the Black Swan restart remains dependent on completion of the studies, the availability of key resources for the project (power, water, human resources) and within a positive nickel price environment.

BLACK SWAN SAFETY WORKS PROGRAMS

Over the quarter Poseidon engaged the Rapallo Group, who successfully completed the previously announced, safety refurbishment works on the Black Swan sulphide nickel processing facility. This program was completed safely late December 2019 and was delivered under budget and on time. The completed refurbishment works now provide safe access to these processing facilities that can support future works for the restart of the Black Swan processing operations.

Figure 1 - Black Swan processing facility safety works program - example of completed works

Page 3

In addition to the processing facility safety refurbishment works, the Silver Swan underground escapeway ladder refurbishment program continues. The anticipated completion remains on target for April 2020. This program is currently within budget and will provide safe access to the Silver Swan decline for further exploration activities and to support future refurbishment of the underground mine. Previous details regarding the activities were released to ASX on 6 September 2019.

Figure 2 - Silver Swan escapeway ladder refurbishment program - example of completed works

BLACK SWAN UNDERGROUND DRILLING

The Underground RC Trial was completed during the quarter with a total of 2,481m being drilled from the Gosling Access Drive, 150m below the Black Swan Open Pit. The trial has provided the Company with an excellent opportunity to develop a robust exploration technique to rapidly and accurately assess the Black Swan Deposit which is in close proximity to the current Silver Swan workings. The underground RC drilling has confirmed the continuity of the known mineralised lodes below the open pit.

Poseidon's adaption of the underground RC technique to nickel exploration has introduced a greater level of certainty of the grade and continuity of mineralisation than could previously be interpreted from the historical diamond drilling. Figure 3 below shows the trial area in relation to historical diamond drill intersections through the Black Swan deposit.

Figure 3 - Deep diamond intercepts in relation to historical drilling and the Black Swan open pit. The RC trial area

lies directly below the open pit.

Page 4

The underground RC technique introduced a large increase in sample volume to help combat natural grade variation. In addition, the underground RC technique allows for the rapid drilling of more closely spaced holes, which further assists in the interpretation and evaluation of mineralisation for use in an underground mining scenario.

Significant intersections from the Underground RC program are tabulated and intersection locations presented in Appendix 1.

The Company aims to undertake further evaluation of the drilling technique and its application to the Black Swan Nickel Deposit in coming months.

WINDARRA EXPLORATION UPDATE

The Company is awaiting assays from the recent RC program at the Crazy Diamond Prospect near Windarra. The Crazy Diamond Prospect is the next komatiite channel to the north of Poseidon's Cerberus Discovery (see Figure 4 below).

Figure 4 - Windarra Nickel Project historical geochemistry and identified komatiite channels

Page 5

Drilling at Crazy Diamond commenced in October 2019 and utilized a 54m capable RC grade-control rig provided by VM Drilling. The purpose of the program was to penetrate the calcareous and sand covered profile to scout-drill and map the underlying stratigraphy.

The komatiite channel at Crazy Diamond is particularly thick, wide and heavily weathered, dominated in areas by silica-cap and calcrete formation and overlain by sandy sediments from local flood plains. Poseidon's drilling was aimed at penetrating the weathered profile to reveal the underlying geology, scope out the size of the underlying channel and assess the unusually complex stratigraphy in this area.

The intersection occurs at the base of the Upper Ultramafic, a subsequent komatiite flow to the Windarra Ultramafic (which hosts the Windarra, South Windarra and Cerberus Deposits). Poseidon's drilling to the North of the Cerberus Deposit in 2011 revealed minor sulphide nickel mineralisation in a similar stratigraphic position some 950m to the South of the recent intersection (refer to Figure 4).

Further exploration will be planned for later in 2020 after a full interpretation of the results and further mapping.

LAKE JOHNSTON EXPLORATION UPDATE

Mapping in 2016 and 2017 conducted by Poseidon at the Lake Johnston Operation confirmed the Company's view that the Western Ultramafic Unit was prospective for Kambalda-style nickel mineralisation.

Poseidon's mapping and interrogation of historical drilling revealed potential channel development along the 16km out-crop length of the komatiite unit.

Over the quarter a soil-survey program was conducted on a 3km length of the komatiite contact on E63/1784, a joint-venture tenement with Pioneer Resources. The samples were tested on site using a hand-held Niton XRF.

The results indicate that mapped areas of the komatiite have nickel sulphide potential. Work is ongoing.

Figure 5 - Soil sample area on E63/1784

Page 6

FINANCIAL

As at 31 December 2019, the Company had cash and current investments of $51.6 million.

Over the previous quarter Poseidon's net cash outflow from operating activities totalled $4.8 million. Expenditures included $3.9 million exploration and evaluation costs, of which $2.4 million was spent progressing the Black Swan restart study and safety work programs and $1.0 million on exploration activities.

Poseidon has forecasted expenditure of $3.5 million over the following quarter of which $2.3 million is to be spent on exploration and evaluation activities.

CORPORATE

Over the quarter Poseidon significantly strengthened its Board and Management team with the appointment of Mr Derek La Ferla as Independent Non-Executive Chairman and Mr Peter Harold as Managing Director and Chief Executive Officer.

Mr La Ferla commenced 1st December 2019 with Mr Harold commencing 3rd March 2020.

MARKET INFORMATION

Figure 6 - 6 month nickel price chart

The nickel price retreated from recent highs above US$8.00/lb over the September 2019 quarter to end the December 2019 quarter at ~US$6.30/lb. More recently the nickel price has retreated further to US$5.70/lb as at today.

David Riekie

Interim CEO

30 January 2020

Page 7

This Quarterly Activities Report was authorised for release by the Board of Directors.

For more information:

David Riekie

CEO david.riekie@poseidon-nickel.com.au+61 (8) 6167 6600

About Poseidon Nickel Limited

Poseidon Nickel Limited (ASX: POS, "Poseidon"), is a West Australian focussed nickel company that owns

three previously operating Nickel Sulphide mines: Windarra, Black Swan/Silver Swan and Lake Johnston. These 100% owned assets collectively had an operating capacity of 3.6mtpa (Lake Johnston 1.5mtpa; Black Swan 2.1mta). The processing facilities at Lake Johnston and Black Swan have been maintained through company managed, care and maintenance programs.

Poseidon released an upgrade to the resource at the Silver Swan deposit on 5th August 2019.

Poseidon is currently undertaking a number of de-risking and restart safety works and similar initiatives at and around Black Swan.

Poseidon has exploration potential at Lake Johnston and Windarra. The outcomes of previous drilling were released to ASX on 22 October 2018 and 21 November 2018.

Windarra has a number of near mine exploration projects including the extension of the original Windarra deposit, Cerberus, South Windarra and Woodline Well.

The current Resource Statement below shows a combined Nickel resource of 395,530 tonnes of Nickel (which should be read with the Competent Person statements below).

Page 8

APPENDIX 1

Black Swan Underground RC Drilling Results

Table 1 - Significant Intersections from Sections 11260N and 11340N

Footwall Lode

Section

Hole ID

m From

m To

Interval

Ni%

Cu%

Co%

MgO%

S%

True Width

11260 N

PBSC001

94.5

109.5

15

0.76

0.02

0.01

33.39

0.93

10

PBSC003

67.5

87

19.5

0.75

0.02

0.02

35.04

1.14

17

PBSC010

18

27

9

0.84

0.03

0.02

34.05

0.58

9

11340 N

PBSC011

15

43.5

28.5

0.73

0.03

0.02

34.33

0.59

22

PBSC012

19.5

39

19.5

0.74

0.03

0.02

34.26

0.40

16

PBSC013

24

46.5

22.5

0.71

0.03

0.02

33.74

0.40

16

PBSC014

28.5

55.5

27

0.63

0.03

0.02

33.11

0.57

16

Central Lode

Section

Hole ID

m From

m To

Interval

Ni%

Cu%

Co%

MgO%

S%

True Width

PBSC003

118.5

138

19.5

0.69

0.03

0.01

33.10

0.98

17

PBSC004

84

129

45

0.77

0.04

0.02

33.43

0.98

37

including

117

129

12

1.16

0.07

0.02

33.64

0.90

12

PBSC005

90

142.5

52.5

0.75

0.03

0.01

34.79

0.83

52

11260 N

including

115.5

142.5

27

0.97

0.03

0.01

36.30

0.69

27

PBSC006

88.5

141

52.5

0.67

0.02

0.02

32.62

0.80

31

including

115.5

132

16.5

0.97

0.04

0.02

33.42

0.85

16

PBSC007

118.5

154.5

36

0.75

0.03

0.01

33.28

0.61

36

including

136.5

154.5

18

1.02

0.03

0.01

33.96

0.64

18

PBSC008

126

162

36

0.89

0.04

0.02

33.47

1.25

23

including

145.5

162

16.5

1.02

0.05

0.02

33.25

1.03

11

PBSC009

87

114

27

0.78

0.03

0.01

31.55

1.03

26

including

91.5

103.5

12

0.94

0.05

0.02

31.92

1.11

11

PBSC010

75

112.5

37.5

0.84

0.04

0.02

34.82

1.28

37

including

81

96

15

0.93

0.05

0.02

33.99

1.74

15

and

105

112.5

7.5

1.27

0.05

0.02

34.95

1.25

7

11340 N

PBSC011

87

126

39

0.82

0.04

0.01

34.13

0.90

35

including

88.5

94.5

6

0.93

0.05

0.02

34.74

1.41

5.5

and

105

117

12

1.13

0.05

0.01

33.51

1.14

11

PBSC012

96

124.5

28.5

0.95

0.04

0.02

34.12

1.13

23

including

111

124.5

13.5

1.27

0.06

0.02

32.90

1.30

11

PBSC013

132

151.5

19.5

0.96

0.04

0.01

36.29

0.98

n/a (part)

including

132

138

6

1.32

0.05

0.02

34.32

1.47

5

and

145.5

151.5

6

1.09

0.06

0.02

36.39

1.04

n/a (part)

Hangingwall 1 Lode

Section

Hole ID

m From

m To

Interval

Ni%

Cu%

Co%

MgO%

S%

True Width

PBSC009

141

150

9

0.90

0.04

0.01

30.63

0.85

9

PBSC010

139.5

153

13.5

0.64

0.03

0.01

37.43

0.51

13

11340 N

PBSC011

139.5

157.5

18

0.92

0.04

0.01

32.68

0.69

17

including

148.5

157.5

9

1.11

0.05

0.02

34.87

0.89

8

PBSC012

133.5

165

31.5

1.00

0.05

0.01

34.21

0.78

30

including

138

156

18

1.20

0.06

0.02

34.13

0.97

17

Hangingwall 2 Lode

Section

Hole ID

m From

m To

Interval

Ni%

Cu%

Co%

MgO%

S%

True Width

PBSC009

178.5

198

19.5

0.84

0.04

0.01

36.00

0.74

19

including

190.5

198

7.5

1.10

0.05

0.02

35.68

0.99

7

11340 N

PBSC010

190.5

198

7.5

0.95

0.04

0.02

34.31

0.77

7

PBSC011

172.5

201

28.5

1.07

0.04

0.01

35.24

0.84

25

including

172.5

178.5

6

1.61

0.07

0.02

35.42

1.35

5

and

193.5

201

7.5

1.31

0.06

0.02

34.99

0.98

7

Page 9

Figure 7 - First Underground RC Trial Section

Figure 8 - Second Underground RC Trial Section

Page 10

APPENDIX 2

Mineral Resource Statement

Table 2: Nickel Projects Mineral Resource Statement

MINERAL RESOURCE CATEGORY

Cut Off

Nickel Sulphide

JORC

INDICATED

INFERRED

TOTAL

Resources

Compliance

Grade

Tonnes

Ni%

Ni Metal

Tonnes

Ni%

Ni Metal

Tonnes

Ni%

Ni Metal

Co%

Co Metal

Cu%

Cu Metal

(Kt)

Grade

(t)

(Kt)

Grade

(t)

(Kt)

Grade

(t)

Grade

(t)

Grade

(t)

BLACK SWAN PROJECT

Black Swan

2012

0.40%

9,600

0.68

65,000

21,100

0.54

114,000

30,700

0.58

179,000

0.01

4,200

NA

-

Silver Swan

2012

4.50%

52

9.19

4,800

84

9.01

7,600

136

9.08

12,400

0.17

250

0.45

600

LAKE JOHNSTON PROJECT

Maggie Hays

2012

0.80%

2,600

1.60

41,900

900

1.17

10,100

3,500

1.49

52,000

0.05

1,800

0.10

3,400

WINDARRA PROJECT

Mt Windarra

2012

0.90%

922

1.56

14,000

3,436

1.66

57,500

4,358

1.64

71,500

0.03

1,200

0.13

5,700

South Windarra

2004

0.80%

772

0.98

8,000

-

-

-

772

0.98

8,000

NA

-

NA

-

Cerberus

2004

0.75%

2,773

1.25

35,000

1,778

1.91

34,000

4,551

1.51

69,000

NA

-

0.08

3,600

TOTAL

Total Ni, Co, Cu

2004 & 2012

16,720

1.01

168,700

27,300

0.82

223,200

44,020

0.89

391,900

0.05

7,450

0.10

13,300

Resources

Note: totals may not sum exactly due to rounding. NA = information Not Available from reported resource model. The Indicated Mineral Resources are inclusive of those Mineral Resources modified to produce the Ore Reserves.

Black Swan Resource as at 22 July 2014, Silver Swan Resource as at 3 June 2016, Maggie Hays Resource as at 17 March 2015, Mt Windarra, South Windarra and Cerberus Resource as at 30 April 2013

Table 3: Gold Tailings Project Mineral Resource Statement

MINERAL RESOURCE CATEGORY

Gold Tailings

JORC

Cut Off

TOTAL INDICATED

Resources

Compliance

Grade

Tonnes

Au Grade

Au

Ag Grade

Ag

(Kt)

(g/t)

(oz)

(g/t)

(oz)

WINDARRA GOLD TAILINGS PROJECT

Gold Tailings

2004

NA

11,000

0.52

183,000

1.9

670,000

TOTAL

Total Au

2004

11,000

0.52

183,000

1.9

670,000

Resources

Note: totals may not sum exactly due to rounding.

Windarra Gold Tailings Resource as at 30 April 2013.

Page 11

APPENDIX 3

Ore Reserve Statement

Table 4: Nickel Projects Ore Reserve Statement

ORE RESERVE CATEGORY

Nickel Sulphide Reserves

JORC Compliance

PROBABLE

Tonnes

Ni%

Ni Metal

Co%

Co Metal

Cu%

Cu Metal

(Kt)

Grade

(t)

Grade

(t)

Grade

(t)

SILVER SWAN PROJECT

Silver Swan

2012

57

5.79

3,300

0.11

60

0.26

150

Underground

Black Swan

2012

3,370

0.63

21,500

NA

NA

NA

NA

Open pit

TOTAL

Total Ni Reserves

2012

3,427

0.72

24,800

0.11

60

0.26

150

Note: Calculations have been rounded to the nearest 10,000 t of ore, 0.01 % Ni grade 100 t Ni metal and 10t of cobalt metal.

Co & Cu grades and metal content for Black Swan require additional modelling prior to estimation. Silver Swan Underground Reserve as at 26 May 2017, Black Swan Open Pit Reserve as at 5 November 2014.

The Company is not aware of any new information or data that materially affects the information in this report and the Resource/Reserve tables above. Such information is based on the information complied by the Company's Geologists and the Competent Persons as listed below in the Competent Person Statements.

COMPETENT PERSON STATEMENTS:

The information in this report that relates to Exploration Results is based on, and fairly represents, information compiled and reviewed by Mr Steve Warriner, Chief Geologist, who is a full-time employee at Poseidon Nickel, and is a Member of The Australian Institute of Geoscientists.

The information in this report which relates to the Black Swan Mineral Resource is based on, and fairly represents, information compiled by Mr Andrew Weeks who is a full-time employee of Golder Associates Pty Ltd. The information in this report which relates to the Black Swan Ore Reserve is based on, and fairly represents, information compiled by Mr Andrew Weeks who is a full-time employee of Golder Associates Pty Ltd and who is a Members of the Australasian Institute of Mining and Metallurgy.

The information in this report which relates to the Silver Swan Mineral Resource is based on, and fairly represents, information compiled by Mr Steve Warriner, Chief Geologist, who is a full-time employee at Poseidon Nickel, and is a Member of The Australian Institute of Geoscientists and Mr Ian Glacken who is a full time employee of Optiro Pty Ltd and is a Fellow of the Australasian Institute of Mining and Metallurgy. The information in this report which relates to the Silver Swan Ore Reserve is based on, and fairly represents, information compiled by Mr Matthew Keenan who is a full-time employee of Entech Pty Ltd and is a Member of the Australasian Institute of Mining and Metallurgy.

The information in this report which relates to the Lake Johnston Mineral Resource is based on, and fairly represents, information compiled by Mr Steve Warriner, Chief Geologist, who is a full-time employee at Poseidon Nickel, and is a Member of The Australian Institute of Geoscientists and Mr Andrew Weeks who is a full-time employee of Golder Associates Pty Ltd and is a Member of the Australasian Institute of Mining and Metallurgy. The information in this report which relates to the Lake Johnston Ore Reserves Project is based on, and fairly represents, information compiled by Mr Matthew Keenan who is a full time employee of Entech Pty Ltd and is a Member of the Australasian Institute of Mining and Metallurgy.

The information in this report that relates to Mineral Resources at the Windarra Nickel Project and Gold Tailings Project is based on, and fairly represents, information compiled by Mr Steve Warriner, Chief Geologist, who is a full-time employee at Poseidon Nickel, and is a Member of The Australian Institute of Geoscientists and Mr Ian Glacken who is a full time employee of Optiro Pty Ltd and is a Fellow of the Australasian Institute of Mining and Metallurgy. The Windarra Project contains Mineral Resources which are reported under JORC 2004 Guidelines as there has been no Material Change or Re-estimation of the Mineral Resource since the introduction of the JORC 2012 Codes. Future estimations will be completed to JORC 2012 Guidelines.

Mr Warriner, Mr Glacken, Mr Weeks, and Mr Keenan all have sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2012 Edition of the

Page 12

'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' (the JORC Code 2012). Mr Warriner, Mr Glacken, Mr Weeks, and Mr Keenan have consented to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The Australian Securities Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this release.

FORWARD LOOKING STATEMENT - INFERRED RESOURCE STATEMENTS:

The Company notes that an Inferred Resource has a lower level of confidence than an Indicated Resource and that the JORC Codes, 2012 advises that to be an Inferred Resource it is reasonable to expect that the majority of the Inferred Resource would be upgraded to an Indicated Resource with continued exploration. Based on advice from relevant competent Persons, the Company has a high degree of confidence that the Inferred Resource for the Silver Swan deposit will upgrade to an Indicated Resource with further exploration work.

The Company believes it has a reasonable basis for making the forward looking statement in this announcement, including with respect to any production targets, based on the information contained in this announcement and in particular, the JORC Code, 2012 Mineral Resource for Silver Swan as of May 2016, together with independent geotechnical studies, determination of production targets, mine design and scheduling, metallurgical testwork, external commodity price and exchange rate forecasts and worldwide operating cost data.

FORWARD LOOKING STATEMENTS:

This release contains certain forward looking statements including nickel production targets. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as "may", "will", "except", "intend", "plan", "estimate", "anticipate", "continue", and "guidance", or other similar words and may include, without limitation, statements regarding plans, strategies and objectives of management, anticipated production and expected costs. Indications of, and guidance on future earnings, cash flows, costs, financial position and performance are also forward looking statements

Forward looking statements, opinions and estimates included in this announcement are based on assumptions and contingencies which are subject to change, without notice, as are statements about market and industry trends, which are based on interpretation of current market conditions. Forward looking statements are provided as a general guide only and should not be relied on as a guarantee of future performance.

Forward looking statements may be affected by a range of variables that could cause actual results or trends to differ materially. These variations, if materially adverse, may affect the timing or the feasibility and potential development of the Silver Swan underground mine.

Page 13

APPENDIX 4

Mining Tenements Held as at 30 December 2019

AREAS OF INTEREST

TENEMENTS

ECONOMIC ENTITY'S INTEREST

Western Australia

Windarra Nickel Assets

MSA 38/261, G38/21, L38/121, L39/184, L38/199, L38/218, L39/221

100%

Windarra South

MSA 38/261, L38/119, L38/122, L38/220

100%

Woodline Well

M39/1075, L39/224

100%

Pool Well

M38/1244, M38/1245, L38/118

100%

Lake Johnston Nickel Assets

E63/1067, G63/0008, G63/0005, L63/0051, L63/0052, L63/0055, L63/0057,

100%

M63/0163, M63/0282, M63/0283, M63/0284, M63/0292, M63/0293,

M63/0294, M63/0522, M63/0523, M63/0524, E63/1784

Black Swan Nickel Assets

M27/0039, M27/0200, M27/0214, M27/0216, L27/0057, L27/0058, L27/0059,

100%

L27/0074, L27/0075, L27/0077, L27/0078, L24/0219, L24/0222, G27/2

E = Exploration Licence M = Mining Lease MSA = Mining Tenement State Act PL = Prospecting Licence

L = Miscellaneous Licence

Mining Tenements Acquired during the December 2019 Quarter

Nil

Beneficial Percentage Interests Held in Farm-In or Farm-Out Agreements during the December 2019 Quarter

Nil

Beneficial Percentage Interests Held in Farm-In or Farm-Out Agreements Acquired or Disposed of during the December 2019 Quarter

Nil

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

+Rule 5.5

Appendix 5B

Mining exploration entity and oil and gas exploration entity

quarterly report

Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

Name of entity

Poseidon Nickel Limited

ABN

Quarter ended ("current quarter")

60 060 525 206

31 December 2019

Consolidated statement of cash flows

Current quarter

Year to date

$A'000

(6 months)

$A'000

1.

Cash flows from operating activities

1.1

Receipts from customers

-

-

1.2

Payments for

(a)

exploration & evaluation

(3,867)

(7,095)

(b)

development

-

-

(c)

production

-

-

(d)

staff costs

(164)

(426)

(e) administration and corporate costs

(761)

(1,311)

1.3

Dividends received (see note 3)

-

-

1.4

Interest received

262

1,057

1.5

Interest and other costs of finance paid

(316)

(956)

1.6

Income taxes paid

-

-

1.7

Research and development refunds

-

181

1.8

Other - sundry income

20

76

1.9

Net cash from / (used in) operating

(4,826)

(8,474)

activities

2.

Cash flows from investing activities

2.1

Payments to acquire:

(a) property, plant and equipment

(8)

(12)

(b) tenements (see item 10)

-

-

(c) investments (** see item 5)

-

35,000

(d)

other non-current assets

-

-

+ See chapter 19 for defined terms

Page 1

1 September 2016

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

Consolidated statement of cash flows

Current quarter

Year to date

$A'000

(6 months)

$A'000

2.2

Proceeds from the disposal of:

(a) property, plant and equipment

-

-

(b) tenements (see item 10)

-

-

(c)

investments

-

-

(d)

other non-current assets

-

-

2.3

Cash flows from loans to other entities

-

-

2.4

Dividends received (see note 3)

-

-

2.5

Other (provide details if material)

-

-

2.6

Net cash from / (used in) investing

(8)

34,988

activities

3.

Cash flows from financing activities

3.1

Proceeds from issues of shares

-

-

3.2

Proceeds from issue of convertible notes

-

-

3.3

Proceeds from exercise of share options

-

-

3.4

Transaction costs related to issues of

-

-

shares, convertible notes or options

3.5

Proceeds from borrowings

-

-

3.6

Repayment of borrowings

-

-

3.7

Transaction costs related to loans and

-

-

borrowings

3.8

Dividends paid

-

-

3.9

Other (provide details if material)

-

-

3.10

Net cash from / (used in) financing

-

-

activities

4. Net increase / (decrease) in cash and cash equivalents for the period

4.1

Cash and cash equivalents at beginning of

56,482

25,133

period (* see item 5)

4.2

Net cash from / (used in) operating

(4,829)

(8,477)

activities (item 1.9 above)

4.3

Net cash from / (used in) investing activities

(8)

34,988

(item 2.6 above)

4.4

Net cash from / (used in) financing activities

-

-

(item 3.10 above)

4.5

Effect of movement in exchange rates on

-

-

cash held

4.6

Cash and cash equivalents at end of

51,645

51,645

period

+ See chapter 19 for defined terms

Page 2

1 September 2016

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

5. Reconciliation of cash and cash equivalents

at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts

Current quarter

Previous quarter *

$A'000

$A'000

5.1

Bank balances

645

1,482

5.2

Call deposits

-

-

5.3

Bank overdrafts

-

-

5.4

Other - Term Deposits < 3 months **

51,000

55,000

5.5

Cash and cash equivalents at end of

51,645

56,482

quarter (should equal item 4.6 above)

  • Cash and cash equivalents at beginning of period / Previous quarter have been adjusted to reflect the classification of term deposits as per the 2019 Annual Report.
  • In addition, $12,000 (previous quarter $35,012,000 adjusted as above) is held in Term Deposits > 3 months with cash flows included as Investments at Item 2.1(c).

6.

Payments to directors of the entity and their associates

Current quarter

$A'000

6.1

Aggregate amount of payments to these parties included in item 1.2

43

6.2

Aggregate amount of cash flow from loans to these parties included

-

in item 2.3

6.3 Include below any explanation necessary to understand the transactions included in items 6.1 and 6.2

7.

Payments to related entities of the entity and their

Current quarter

associates

$A'000

7.1

Aggregate amount of payments to these parties included in item 1.2

15

7.2

Aggregate amount of cash flow from loans to these parties included

-

in item 2.3

7.3 Include below any explanation necessary to understand the transactions included in items 7.1 and 7.2

For consulting services performed by related parties or their associates.

+ See chapter 19 for defined terms

Page 3

1 September 2016

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

8.

Financing facilities available

Total facility amount

Amount drawn at

Add notes as necessary for an

at quarter end

quarter end

understanding of the position

$A'000

$A'000

8.1

Loan facilities

US$17,500

US$17,500

8.2

Credit standby arrangements

-

-

8.3

Other (please specify)

-

-

8.4 Include below a description of each facility above, including the lender, interest rate and whether it is secured or unsecured. If any additional facilities have been entered into or are proposed to be entered into after quarter end, include details of those facilities as well.

Unsecured Convertible Note held by Black Mountain Metals Pty Ltd - interest rate of 5% per annum, denominated in US$ and repayable on 30 September 2020 with a conversion price of AU$0.09 per share.

9.

Estimated cash outflows for next quarter

9.1

Exploration and evaluation

9.2

Development

9.3

Production

9.4

Staff costs

9.5

Administration and corporate costs

9.6

Other (provide details if material)

9.7

Total estimated cash outflows

10.

Changes in

Tenement

Nature of interest

tenements

reference

(items 2.1(b) and

and

2.2(b) above)

location

  1. Interests in mining tenements and petroleum tenements lapsed, relinquished or reduced
  2. Interests in mining tenements and petroleum tenements acquired or increased

$A'000

2,300

-

-

400

800

-

3,500

Interest at

Interest

beginning

at end of

of quarter

quarter

+ See chapter 19 for defined terms

Page 4

1 September 2016

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

Compliance statement

  1. This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.
  2. This statement gives a true and fair view of the matters disclosed.

Sign here:

Date: 30 January 2020

Joint Company Secretary

Print name:

Brendan Shalders

Notes

  1. The quarterly report provides a basis for informing the market how the entity's activities have been financed for the past quarter and the effect on its cash position. An entity that wishes to disclose additional information is encouraged to do so, in a note or notes included in or attached to this report.
  2. If this quarterly report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
  3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.

+ See chapter 19 for defined terms

Page 5

1 September 2016

Attachments

  • Original document
  • Permalink

Disclaimer

Poseidon Nickel Limited published this content on 30 January 2020 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 30 January 2020 09:54:00 UTC