Nordic Gold Inc. announced that it has produced a total of 145.3 kg of doré (4,100.22 ounces of gold) since the first pour on 30 November 2018. 38.5 kg doré were produced at the 1st pour (1,028.91 oz of gold) and 78 kg of doré (1,981.3 oz gold) was produced in December 2018, resulting in total 2018 production of 116.5 kg of doré (3,010.2 oz of gold). To date, production in 2019 is 39.7 kg of doré (1,090 oz). Processing operations were shut down for planned maintenance. Certain parts of the mill liners were unavailable at startup, however it was decided to press ahead and produce gold. This decision was made to improve cash flow and a maintenance shutdown was planned accordingly. Gold sales provided $5,172,323 of additional cash.