ASX ANNOUNCEMENT
8 December 2021
For personal use only
AMENDED COMPANY PRESENTATION
Odyssey Gold Limited (ASX:ODY) ("Odyssey" or "Company") advises that it has amended its recent company presentation to include the source of the information used for the comparison graph on slide six titled 'Untested Depth Potential'.
The revised company presentation is attached.
This ASX announcement has been authorised for release by the Company's Executive Director, Mr Matthew Syme.
For further information, please contact:
Matt Syme
Executive Director: +61 8 9322 6322
UNEARTHING THE POTENTIAL OF THE | ||
use only | TUCKANARRA GOLDFIELDS | |
ersonal | ||
DECEMBER 2021 | ||
1 |
Odyssey Controls the Historic Tuckanarra Goldfields
Part of the prolific Murchison Goldfields, host to a +35Moz gold endowment.
only | |
| Historical high-grade production centre. |
| Very little modern, systematic exploration. |
use | |
| Proximal to multiple gold processing plants, straddling the |
Great Northern Highway. | |
ersonal | |
| 25 high quality exploration targets, ranging from resource |
drilling stage to untested, with more emerging.
2
Very Fertile Gold Belt - Historical Exploration has only Scratched the Surface
only | |||
85km of BIF & | |||
metasedimentary sequences: | |||
| 24% has known gold | ||
mineralisation; | |||
| 76% is untested. | ||
use | |||
ersonal | |||
5 open pits mined in the 1990's | |||
- t | rgeting shallow, oxide ore. |
- 101,378oz @ 3.9g/t produced.
3
8km of unexplored greenstones - never drilled.
Exploration History
Initial discovery by Boyle and Moore, in 1887.
Tuckanarra State | Battery was built in 1898 and | |
operated for over 10 years. | ||
| Mining focused | on high-grade quartz veins, |
ge erally limited to the depth of the water table. | ||
only D rmant until late 1980's, when Metana Minerals | ||
NL (principally) explored and mined for oxide ore | ||
for the nearby Reedy's mill. | ||
use | ||
| Exploration focused on shallow drilling around the |
historical workings.
Excavated 5 shallow pits (~50-60mdepth) for ersonal101.4koz at an average grade of 3.9g/t.
Pursued a high-grade shoot at Kohinoor in three stages of mining (OP & UG) to 200m depth for 29.3koz @ 5.5g/t.
4
Ruins of Tuckanarra State Battery.
Abundance of historical prospector workings. Maybelle pit in the background.
Lucknow
Workings
4
This is an excerpt of the original content. To continue reading it, access the original document here.
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Odyssey Energy Limited published this content on 08 December 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 08 December 2021 03:31:01 UTC.