Norwest Minerals Limited announced that Reverse Circulation ("RC") drilling has recommenced at its 100% owned Bulgera Gold Project, with West Drill engaged to complete 13 deep RC holes. West Drill are very familiar with the local ground conditions having spent the past few years drilling for Vango Mining Limited on tenements neighboring Norwest's Bulgera Gold Project. Drilling of the deepest of the planned 13 RC holes (BRC21001), was completed on 18 January 2021 at 276m with alteration typical of hosting Bulgera gold mineralisation intersected from 235m to 255m. The tenor of gold mineralisation within the alteration zone will be confirmed by laboratory assay work being undertaken by SGS laboratories in Perth, with assay results expected in approximately 3 weeks. Drilling prior to the Christmas period, intersected multiple gold zones of moderate tenor and widths in all 9 completed RC holes. The multiple lodes of gold mineralisation intersected between 50 and 100 vertical metres support the continuation of gold mineralisation at depth. The holes being drilled this month are designed to test for deeper extensions to known mineralisation by drilling 150 vertical metres below the Bulgera and Mercuri open pits.