Melkior Resources Inc. announced that a 95 line kilometer airborne survey has been awarded to Pioneer Aerial Surveys Ltd. using their UAV-MAGTM system for the Denton Project. The UAV-MAGTM survey will cover the 20 cell mining cells with 50m line spacing. The Denton Project is located about 25 km west of Timmins, Ontario and 500m south of the Carscallen Project. It is anticipated that the UAV-MAGTM survey will commence in early February 2019. The Denton Project is interesting as it lies over what is mapped as a westerly trending sequence of Archean volcanic rocks that include ultramafic units within a prominent hinge area and in proximity to the somewhat elusive Destor Porcupine Fault. The Denton Project is surrounded by Tahoe Canada and on strike with a what is interpreted to be a new target that Tahoe appeared to be developing when exploration was effectively terminated in 2017. Following up on gold mineralization reported in historic drilling it is interpreted that deep drilling may have been targeting mineralization associated with syenite in proximity with ultramafics. Melkior is currently targeting north-south structures that host gold mineralization within the granitic host rock north of Highway 101, the Denton Project is located south of established mineralized structures in the Carscallen Project and north of the Destor Porcupine Fault.