QUARTERLY REPORT

onlyASX Symbol: LEG

ASX:LEG | 14 JULY 2022

JUNE 2022

LEGEND MINING LIMITED

HIGHLIGHTS - Rockford Project, Fraser Range

ABN 22 060 966 145

Three diamond drillholes completed at Mawson,

with the fourth in progress and fifth in planning

use

65 regional aircore drillholes completed

with

Level 1, 8 Kings Park Road

assays pending and programme ongoing

West Perth

Western Australia 6005

Innovative MLTEM surveys completed over the

PO Box 626

northern Rockford project area with programme

West Perth

ongoing

personal

Western Australia 6872

Cash circa $15M at 30 June 2022

Phone:

+61 8 9212 0600

OVERVIEW

Facsimile:

+61 8 9212 0611

Email:

The June 2022 Quarter has been a very productive period for field

legend@legendmining.com.au

activity across the Rockford Project, with diamond drilling of seismic

Website:

targets

at Mawson while regional aircore drilling and MLTEM

www.legendmining.com.au

surveys continue over prospective targets.

The first two diamond holes have intersected packages of rocks

CONTACT

which are consistent with the geological interpretation of the seismic

Mr Mark Wilson

data. The third hole is currently being downhole surveyed

with

drilling at the fourth hole currently in progress. Collar locations and

For

Managing Director

drill traces of these holes are shown on Figure 2 in the body of this

Mr Oliver Kiddie

report. Thorough interpretation of the seismic data from these holes

Executive Director

will only be possible once all the follow up information (DHTEM,

geochemistry from assays, petrophysics, etc) is received and

processed.

PROJECTS

Meanwhile the regional aircore drilling and innovative MLTEM

Rockford - Fraser Range:

surveys continue to identify a pipeline of prospective nickel-copper

Nickel-Copper(Ni-Cu)

targets.

Copper-Zinc-Silver(Cu-Zn-Ag)

Gold (Au)

JUNE 2022 QUARTERLY REPORT

1 | P a g e

QUARTERLY REPORT

For personal use only

ROCKFORD PROJECT (Fraser Range District)

Nickel-Copper,Copper-Zinc-Silver, Gold

Legend's Rockford Project is located in the highly prospective Fraser Range district of Western Australia and considered prospective for mineralisation styles including magmatic nickel-copper, VMS zinc-copper-silver and structurally controlled gold.

The Rockford Project comprises 15 granted exploration licences (14 contiguous) covering a total area of 3,056km2 (see Figure 1). A detailed breakdown of ownership, area and manager is given below:

  • Legend (100%) 206km2
  • Legend (70%)/Creasy Group (30%) two JVs covering 2,192 km2 with Legend manager
  • IGO (60%)/Creasy Group (30%)/Legend (10% free carry) JV covering 634km2 with IGO manager
  • IGO (70%)/Legend (30% free carry) JV covering 24km2 with IGO manager

Activities continued during the June 2022 Quarter at the Rockford Project, with diamond drilling testing seismic targets at the lead Mawson Prospect, while regionally, innovative EM and aircore drilling continued to identify a new pipeline of prospective Ni-Cu targets.

3D model evolution utilising updated geological and geophysical modelling, including 3D seismic, continues to drive focused exploration targeting at Mawson. The aim of the seismic survey was to define the architecture of the Mawson intrusion in relation to the stratigraphic package, to a depth of investigation of a minimum 1000m below surface across a 6.5km2 area. Diamond drilling of select seismic features continues, with initial results supporting the application of seismic as a targeting technique in the Fraser Range.

Regionally, extensive datasets have continued to be expanded and interrogated to generate a new pipeline of Ni-Cu-Co sulphide targets. A 30,000m first pass aircore drilling continues across new and existing targets. Additionally, innovative MLTEM and FLTEM surveys continue across high priority targets at the Rockford Project.

JUNE 2022 QUARTERLY REPORT

2 | P a g e

QUARTERLY REPORT

For personal use only

Figure 1: Rockford Project with current prospect locations and targets over regional gravity inversion

JUNE 2022 QUARTERLY REPORT

3 | P a g e

QUARTERLY REPORT

only

Mawson Prospect

The aim of the seismic survey was to define the architecture of the Mawson intrusion in relation to the

stratigraphic package, to a depth of investigation of a minimum 1000m below surface across a 6.5km2 area.

The 3D seismic data supports the exploration model at Mawson, that a large intrusive source continues at

depth below drilling completed to date. 3D seismic reflectors clearly map the mineralised chonolith in drilled

areas down to 500m below surface, with the chonolith interpreted to extend below 500m, below the

use

Mawson fault, to a possible keel position at ~800m to 1,000m. This interpreted keel position is defined by

a complex set of reflectors and structural breaks, consistent with the seismic signature of the Mawson

discovery zone (see Figure 3).

RKDD081 was the first diamond drillhole to interrogate

the interpreted keel below the Mawson fault (see Figure

2 and Figure 3). Drilling conditions encountered resulted

in slower than anticipated drilling rates and a swing in

personalFor

the hole trace, with rotation, away from planned

trajectory. The drillhole largely intersected intrusive

suites and metasedimentary packages where predicted.

The lower zone of the target zone intersected various

mafic intrusive suites, including a heavily disseminated

gabbronorite intrusion at 840m downhole (see Photo 1).

Early interpretation of the intrusive suite intersected in

RKDD081 suggests the drillhole has tested an area

marginal to the main chonolith. Further data analysis and

additional drilling will aid in refinement of the initial

interpretation. Assay results are pending.

Photo 1: Heavy disseminated sulphide intrusion from RKDD081 from 840m, NQ2

JUNE 2022 QUARTERLY REPORT

4 | P a g e

QUARTERLY REPORT

For personal use only

Figure 2: Mawson chonolith, diamond drillholes, and section locations

Figure 3: 3D Seismic section A-A' showing the Mawson chonolith with diamond drillhole RKDD081

*Note - RKDD030 and RKDD033 projected onto section for illustration purposes

JUNE 2022 QUARTERLY REPORT

5 | P a g e

This is an excerpt of the original content. To continue reading it, access the original document here.