Pipestone Energy Corp. was notified by Keyera Corp. (“Keyera”) on January 17, 2020 of an electrical failure within the Keyera Wapiti Gas Plant (“Keyera Plant”). This failure has resulted in an unplanned outage. Keyera expects it to be repaired and resume operations of the Keyera Plant within approximately two weeks.