Kenorland Minerals Ltd. announced final drill results from the 2024 winter drill program at the Frotet Project (the Project), located in northern Quebec. Assays from the 27 drill holes, totaling 18,448m of drilling completed during the program, are reported herein. Kenorland currently holds a 4% net smelter return royalty and is operator of the Project.

Highlights include the following: 24RDD197: 4.70m at 24.16 g/t Au incl. 0.40m at 261.20 g/t Au at R2; 24RDD215: 9.50m at 9.10 g/t Au incl. 1.20m at 45.92 g/t Au at R6; 24RDD213: 4.50m at 16.11 g/t Au incl.

0.40m at 163.70 g/t Au at R1; 24RDD199: 5.83m at 12.36 g/t Au incl. 1.11m at 48.24 g/t Au at R9; 24RDD202: 12.00m at 5.94 g/t Au incl. 2.50m at 21.99 g/t Au at R1; 24RDD198: 29.50m at 2.41 g/t Au incl.

7.20m at 6.27 g/t Au at R6; 24RDD202: 26.60m at 2.54 g/t Au incl. 2.10m at 6.04 g/t Au at R6; 24RDD217: 9.75m at 6.91 g/t Au incl. 0.95m at 44.99 g/t Au at R6; 24RDD202: 1.90m at 31.09 g/t Au incl.

0.55m at 103.50 g/t Au at R1; 24RDD200A: 5.15m at 11.10 g/t Au incl. 0.60m at 73.40 g/t Au at R8; 24RDD207: 11.10m at 5.08 g/t Au incl. 0.40m at 106.90 g/t Au at R6; 24RDD198: 2.90m at 17.71 g/t Au incl.

0.30m at 153.70 g/t Au at R1.