Kasbah Resources Limited announced an upgrade to the Ore Reserve Estimate for the Achmmach Tin Project (The Project) in Morocco. The increased Ore Reserve at Achmmach is based on the mine plan incorporated in the Project's 2018 Definitive Feasibility Study (DFS) released today. It has a 7% increase in total tin ore tonnes and a 4% increase in total contained tin. The new Ore Reserve Estimate is 7.0 million tonnes @ 0.82% Sn (Tin) for 58,000 tonnes of contained tin, which represents an increase in contained tin of 2,000 tonnes from the previous Ore Reserve reported in 2016.