29 April 2022

QUARTERLY ACTIVITIES REPORT

FOR THE PERIOD ENDING

31 MARCH 2022

Highlights:

  • Infinity received gold assay results for its first pass, 12-hole (724m) RC drilling program, from the Great Northern Gold Prospect near Leonora, WA.

    • o The 2022 RC Drilling Program was designed to verify gold mineralisation reported in historical RC drill holes completed by Melita Mining NL in 1987-1988.

    • o The 2022 RC drilling program returned multiple gold intersections over 1 g/t Au, with individual assays up to a maximum of 10.95 g/t Au (1 m sample).

    • o Significant gold intercepts include:

      • 5 m @ 2.48 g/t Au from 37 m depth in hole GN22RC101.

      • 4 m @ 3.68 g/t Au from 30 m depth in hole GN22RC111.

      • Including 1 m @ 10.95 g/t Au from 32 m depth in hole GN22RC111

    • o Detailed 3D modelling of the geology and mineralisation is to be undertaken, which will allow Infinity to design a follow-up drilling program to test possible extensions of the gold mineralisation.

  • A 194-hole Aircore drilling program was completed at Barlows Gully for a total advance of 679 m. Assay results are pending.

  • Exploration work has continued at Victor Bore and Craig's Rest tenements including geological mapping, soil sampling and rock chip sampling. Assay results are pending.

  • A new comprehensive data compilation and data interpretation program in the Pilbara has identified a range of new target areas to focus on in the future.

Infinity Mining Limited (ASX: IMI) ("Infinity" or the "Company") is pleased to report on its activities for the quarter ending 31 March 2022.

The Company's planned exploration programs are focused on a package of tenements in the Pilbara region and the Central Goldfields region of Western Australia. Infinity holds 697 sq km in the Pilbara area to the SW of Port Headland, and a further 13.81 sq km in the Central Goldfields around Leonora (see Figure 1).

Figure 1: Location map showing Infinity's two areas of exploration.

Review of Operations

Central Goldfields Projects - Leonora District

The Central Goldfields Tenements are highly prospective for orogenic gold systems, in the area around the gold mining district of Leonora, WA. A map showing the location of Infinity's tenements is included as Figure 2.

Figure 2: Location map showing Infinity's Central Goldfields Projects

Great Northern

A 12-hole RC drilling program for 724 m total drilling was completed during the March quarter at the Great Northern tenement (P37-8310). The program was completed in January 2022 and gold assays were returned to the company in March 2022. Multi-element analyses for a selection of samples are still pending. The results were included in the Infinity ASX Announcement dated 25 March 2022 and are summarised below.

The RC program was designed to verify the gold mineralisation intersected in a historical RC drilling program completed by Melita Mining NL in 1987-1988. The Melita drilling program was originally reported in 1988 (see WAMEX Report A25349). Drill collar tables for both Infinity and Melita RC drilling programs are included below (see Tables 1 and 2). A map showing the collar locations (and drill traces) of both Infinity and Melita RC drill holes, is included below as Figure 3.

Table 1: RC Drill hole collar details for 2022 Infinity drilling program at Great Northern.

Hole_ID

GDA_EAST

GDA_NORTH

RL

Dip

Azimuth

Depth (m)

Date Completed

GN22RC100

351587

6801331

412

-60

212

90

10/01/2022

GN22RC101

351583

6801295

430

-60

212

66

10/01/2022

GN22RC102

351573

6801284

395

-60

212

48

9/01/2022

GN22RC103

351557

6801326

389

-60

212

60

11/01/2022

GN22RC104

351547

6801312

394

-60

212

48

11/01/2022

GN22RC105

351574

6801316

398

-60

212

78

11/01/2022

GN22RC106

351564

6801304

351

-60

212

66

11/01/2022

GN22RC107

351603

6801288

394

-60

212

60

9/01/2022

GN22RC108

351598

6801281

391

-60

212

48

9/01/2022

GN22RC109

351625

6801288

388

-60

212

66

9/01/2022

GN22RC110

351617

6801270

396

-60

212

40

8/01/2022

GN22RC111

351554

6801287

386

-60

212

54

12/01/2022

Table 2: RC Drill hole collar details for 1987-1988 Melita drilling program at Great Northern.

Hole

GDA94 East

GDA94 North

Dip

Azimuth

Depth (m)

GN01

351577

6801288

-60

210

45

GN02

351584

6801303

-60

210

65

GN03

351554

6801320

-60

210

54

GN04

351621

6801278

-60

210

78

GN05

351592

6801312

-60

210

80

GN06

351559

6801283

-60

210

13

GN07

351545

6801297

-60

210

38

GN08

351553

6801275

-60

210

32

GN09

351603

6801288

-60

210

60

GN10

351521

6801340

-60

210

60

GN11

351570

6801311

-60

210

61

Figure 3: Drill hole collar location map at Great Northern showing both Infinity and Melita drill holes, plus drill hole traces.

The Great Northern RC drilling program was successful in verifying the subsurface gold mineralisation, as reported by Melita Mining NL in Melita's Annual Report to August 1988 (WAMEX Report A25349). Assays from the Infinity RC program returned multiple gold intercepts over 1 g/t Au, with individual assays up to 10.95 g/t Au (1 m sample).

Significant gold intercepts from the Infinity RC program are reported below in Table 3, which were calculated using a 0.2 g/t Au cut-off grade. Significant intercepts from the Melita Mining ML RC drilling program (1987-88) are also included below in Table 4 for comparison.

The maximum gold assay from the Melita program was 24.1 g/t Au, from 12-13 m (EOH) in hole GN06. All gold intercepts quoted within Tables 3 and 4 are weighted averages of the gold assays from 1 m RC drilling samples, using a cut-off grade of 0.2 g/t Au. Infinity has confidence in the Melita drilling data, as the historical results compare moderately well with Infinity's drilling results. Infinity reported the Great Northern drilling results under the JORC (2012) Code including a JORC Table 1, in its ASX Announcement dated 25 March 2022.

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Infinity Mining Ltd. published this content on 28 April 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 29 April 2022 01:41:12 UTC.