GTT will design the tanks of this FSRU, with a total capacity of 170,000 m3. The tanks will be fitted with theMark IIImembrane containment system developed by GTT.
The delivery of this FSRU is scheduled for the third quarter of 2027.
Press Contact:press@gtt.fr/ +33 1 30 23 56 37
[1]FSRUs are stationary vessels able to receive, store and regasify LNG from LNG carriers.
>PDF version
Attachments
- Original Link
- Permalink
Disclaimer
GTT – Gaztransport & Technigaz SA published this content on 26 June 2024 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 26 June 2024 15:47:39 UTC.