GTI Energy Ltd. announced that two drill rigs have commenced drilling at the Thor ISR uranium prospect at its Great Divide Basin (GDB) project in Wyoming. Drilling At Thor: rilling has commenced at the Thor prospect, located adjacent to Ur-Energy Inc.'s (URE) 18Mlb Lost Creek uranium deposit and operating ISR uranium processing plant. Exploration at Thor to date identified mineralisation with economic potential based on widths, grades & depth of mineralisation.

Four holes have been completed to date of the planned 70-hole (~40,000 ft) campaign to target extensions of 2 miles of mineralised roll front identified from drilling earlier this year. Drilling is focused in the north-east the project, including at the two state leases. Drilling at Wicket East: Wicket East lies on the southern boundary of Ur-Energy's Lost Soldier Deposit.

Drilling of up to 20 holes (~20,000ft) at Wicket East seeks to explore a projected mineralised trend extending from the southern boundary of URE's Lost Soldier property for ~3 miles. This mineralised trend is interpreted from historic drilling information similar to that used at Thor. Drilling at Odin, Loki & Teebo: Odin & Teebo are adjacent to Uranium Energy Corp.'s (UEC) Antelope Project.

Loki sits south of Antelope & north of URE's Lost Creek. Drilling of ~40 holes (~40,000 ft) across all 3 prospects will explore ~5 miles of mineralised trends interpreted from the historic information used at Thor.