Starr Peak Mining Ltd. (Starr Peak) have announced that after analysis of soil, geochemical and VTEM data, that they will “complete a 2-week field program prior to executing the drill phase, with the purpose of validating anomalous areas to refine drilling targets”. A total of 12 target areas have been identified “some of which are located along VTEM (versatile time domain electromagnetic) geophysical anomalies”.
Click here to access Starr Peak’s current press release.
Globex retains a 2.5% Gross Metal Royalty on
This press release was written by
We Seek Safe Harbour. | Foreign Private Issuer 12g3 – 2(b) |
CUSIP Number 379900 50 9 LEI 529900XYUKGG3LF9PY95 | |
For further information, contact: | |
President & CEO 86, 14th Street | Tel.: 819.797.5242 Fax: 819.797.1470 info@globexmining.com www.globexmining.com |
Forward Looking Statements: Except for historical information, this news release may contain certain “forward looking statements”. These statements may involve a number of known and unknown risks and uncertainties and other factors that may cause the actual results, level of activity and performance to be materially different from the expectations and projections of
Source:
2024 GlobeNewswire, Inc., source