Gitennes Exploration Inc. is planning a second phase of diamond drilling on its Snowbird High Grade Gold Project located in north central British Columbia. In November Gitennes completed its first phase of drilling which consisted of ten NQ2 sized diamond drill holes totaling 1,212 metres. The second phase of drilling is planned for up to 2,000 metres of NQ2 core with the objective of expanding and extending the gold mineralized structures within the 25 to 150 metres wide mineralized corridor that is contained within the 4.8 kilometre long Sowchea Fault Zone. The second phase of drilling will follow up on the positive results from the first phase of drilling which were released on December 12, 2017. These included: Hole SB14-04 - 16.20 g/t gold over 1.0 metre, Hole SB17-02 - 9.73 g/t gold over 0.78 metre and Hole SB17-08 - 8.24 g/t gold over 0.52 metres. Gitennes submitted 375 core samples for analysis from the phase one drilling programme. Statistically the Gitennes 2017 Phase 1 drilling campaign results mirrored those of the historical drilling campaigns between 1980 and 1989. Historically, 6.4% of gold assays graded more than 1 gpt. In 2017, the Gitennes campaign resulted in 5.7% of the gold assays grading more than 1 gpt, effectively identical results.