Bam Bam Resources Corp. provided an update for the ongoing analysis of the samples from the 2021 core and reverse-circulation drill program at the Majuba Hill Project in Pershing County Nevada. Bam Bam drilled 4,539.5 meters (14,893.5 feet) in sixteen holes.

The drill program was designed to complete in-fill, stepout, and new exploration holes for three areas. Majuba Known Copper Oxide (In-fill and Stepout), DeSoto Copper Oxide Target (Stepout), Copper-Gold Target (New Exploration). A total of 3,167 samples were submitted to the ALS USA Inc. sample Prep Facilities in Reno and Elko, Nevada.

Bam Bam has an active tracking program and the sample status information provided by ALS indicates all assays should be complete by early February. Assay results will be reported as soon as the results are integrated into the database and the QA/QC analyses are complete. Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody; The Company has implemented a QA/QC program using best industry practices at the Majuba Hill Project.

The samples are transported from the BBR secure warehouse or directly from the project to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS then transports the prepared pulps to their analytical lab in Reno, Nevada or Vancouver, B.C. Soil and rock chip samples are transported by the company directly to Elko or Reno, Nevada. Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth sample bags.

All samples are analyzed for copper, gold, silver, and 33 other elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are determined by ALS method ME-ICP61 which is a four acid digestion and ICP-AES assay.

Approximately 5% of the submitted samples are drill duplicates and copper- gold-porphyry commercial standard reference material pulps.