First Point Minerals Corp. announced the final batch of results for the remaining eight holes of the 27 resource definition holes completed during the 2012 drilling campaign at the Decar nickel-iron alloy project in central British Columbia. The drill results from this third and final batch of results have extended the Baptiste deposit by 580 metres along strike to the northwest.

Highlights, as reported in Davis Tube magnetically-recovered ("DTR") nickel, include: Northwest Extension: 12BAP-51 220m of 0.121% DTR nickel; 12BAP-54 419m of 0.143% DTR nickel; 12BAP-57 492m of 0.116% DTR nickel; 12BAP-59 375m of 0.148% DTR nickel; 12BAP-60 240m of 0.152% DTR nickel; 12BAP-61 152m of 0.125% DTR nickel. Northwestern Infill: 12BAP-56 512m of 0.142% DTR nickel. The final batch of results are for seven holes that stepped out on the northwest end of the Baptiste deposit, which remains open, one infill hole in the northwestern area and two hydrological holes.

The Baptiste deposit continues to remain open in several directions, including along strike in both directions, to the southeast in the central area and at depth over the entire system. It is covered by an average of 12 metres of overburden.