EnviroGold Global Limited is commencing a pilot program to optimize its patent-pending process' application to the Hellyer Tailings Reprocessing Project (the “Process”). Results of Phase 1 are expected in early First Quarter 2023 and will be a key milestone to deploying a full-scale pilot program as a precursor to plant engineering and construction at Hellyer. The Program is intended to optimize the Process' effectiveness and efficiency through bench scale and larger-scale pilot plant optimization.

The Program will establish the maximum metal extraction achievable from tailings, producing precious metals dore´, copper and zinc products, and confirm baseline reagent requirements. The Program will also elicit data necessary for economic validation and engineering design, as well as demonstrate the neutralization of the waste product (from acid-forming pyrites to inert goethite and scorodite precipitation), thereby demonstrating the significant environmental benefits.