The Technical Reports are entitled “NI 43-101 Technical Report: Updated Mineral Resource and Reserve Estimates for the Guanaceví Project, Durango State, Mexico” (the “2022 Guanacevi Report”) with an effective date of
Below is a summary of material information from the 2022 Guanacevi Report
Mineral Resource Estimate:
Classification | Tonnes | Grade | Contained Metal | |||||
Mass (kt) | Silver (g/t) | Gold (g/t) | AgEq (g/t) | Silver (koz) | Gold (koz) | AgEq (koz) | ||
Measured | 138.8 | 569 | 1.4 | 670 | 2,538 | 6.1 | 2,992 | |
Indicated | 575.6 | 443 | 1.1 | 528 | 8,197 | 21.0 | 9,770 | |
Measured and Indicated | 714.4 | 467 | 1.2 | 556 | 10,735 | 27.0 | 12,762 | |
Inferred | 838.7 | 416 | 0.9 | 487 | 11,225 | 25.0 | 13,132 |
Notes:
- The effective date of the Mineral Resource estimate is
May 31, 2022 . The QP for the estimate, Mr.Richard A. Schwering , SME-RM of Hard Rock, is independent ofEndeavour Silver . - Inferred Mineral Resources are that part of a Mineral Resource for which the grade or quality are estimated on the basis of limited geological evidence and sampling. Inferred Mineral Resources do not have demonstrated economic viability and may not be converted to a Mineral Reserve. It is reasonably expected, though not guaranteed, that the majority of Inferred Mineral Resources could be upgraded to Indicated mineral resources with continued exploration.
- Measured, Indicated and Inferred resource silver equivalent cut-off grades were 252 g/t for veins inside the El Curso and Porvenir Frisco Concession, 212 g/t for the Santa Cruz Sur Vein System, and 219 g/t for the remaining Mineral Resources including those veins estimated using VLP methods at Guanaceví.
- Metallurgical recoveries were 86.4% for silver and 90.1% for gold.
- Silver equivalents are based on a 79.6:1 silver to gold price ratio.
- Price assumptions are
$US21.80 per troy ounce for silver and$US1,735.00 per troy ounce for gold for the Mineral Resource cut-off calculations. These prices are based on the 36-month moving average as of the effective date. - Mineral Resources are reported exclusive of Mineral Reserves.
- Rounding may result in apparent differences when summing tonnes, grade and contained metal content. Tonnage and grade measurements are in metric units. Grades are reported in grams per tonne (g/t). Contained metal is reported as troy ounces (t. oz).
Mineral Reserve Estimate:
Classification | Tonnes | Grade | Contained Metal | ||||
Mass (kt) | Silver (g/t) | Gold (g/t) | AgEq (g/t) | Silver (koz) | Gold (koz) | AgEq (koz) | |
Proven | 162.7 | 543 | 1.31 | 648 | 2,841 | 6.9 | 3,390 |
Probable | 1,096.7 | 466 | 1.11 | 555 | 16,445 | 39 | 19,579 |
Proven and Probable | 1,259.4 | 476 | 1.14 | 567 | 19,287 | 46.0 | 22,969 |
Notes:
- Cutoff Grades: 219 g/t AgEq for Milache; 212 g/t AgEq for
Santa Cruz Sur and 252 g/t AgEq forEl Curso and El Porvenir including the royalties payable. - Minimum Mining Width: 0.8m.
- External Dilution Long Hole: 35% (Milache 40%)
- Silver Equivalent: 79.6:1 silver to gold
- Gold Price: US
$1,735 /oz. Silver Price : US$21.80 /oz.- Gold Recovery: 91.0%
- Silver Recovery: 86.4%
- Mineral resources are estimated exclusive of and in addition to mineral reserves.
- Figures in table are rounded to reflect estimate precision; small differences generated by rounding are not material to estimates.
Below is a summary of material information from the 2022 Bolañitos Report
Mineral Resource Estimate:
Classification | Tonnes | Grade | Contained Metal | |||||
Mass (kt) | Silver (g/t) | Gold (g/t) | AgEq (g/t) | Silver (koz) | Gold (koz) | AgEq (koz) | ||
Measured | 42.0 | 97 | 3.0 | 322 | 131 | 4.0 | 435 | |
Indicated | 411.5 | 111 | 2.3 | 279 | 1,470 | 30.0 | 3,697 | |
Measured and Indicated | 453.5 | 110 | 2.3 | 283 | 1,601 | 34.0 | 4,132 | |
Inferred | 1,656.6 | 141 | 2.5 | 331 | 7,494 | 132.2 | 17,608 |
Notes:
- The effective date of the Mineral Resource estimate is
May 31, 2022 . The QP for the estimate, Mr.Richard A. Schwering , SME-RM of Hard Rock, is independent of Endeavour. - Inferred Mineral Resources are that part of a Mineral Resource for which the grade or quality are estimated on the basis of limited geological evidence and sampling. Inferred Mineral Resources do not have demonstrated economic viability and may not be converted to a Mineral Reserve. It is reasonably expected, though not guaranteed, that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
- Measured, Indicated, and Inferred resource silver equivalent cut-off grades were 149 g/t for veins located in the La Luz and San Miguel production areas and veins estimated using VLP methods at Bolañitos, 157 g/t for the Belen vein system, and 151 g/t for veins located in the Lucero production area.
- Metallurgical recoveries were 85.7% for silver and 90.1% for gold.
- Silver equivalents are based on a 79.6:1 silver to gold price ratio.
- Price assumptions are
$US21.80 per troy ounce for silver and$US1,735.00 per troy ounce for gold for resource cut-off calculations. These prices are based on the 36-month moving average as of the effective date. - Mineral Resources are reported exclusive of Mineral Reserves.
- Rounding may result in apparent differences when summing tonnes, grade and contained metal content. Tonnage and grade measurements are in metric units. Grades are reported in grams per tonne (g/t). Contained metal is reported as troy ounces (t. oz).
Mineral Reserve Estimate:
Classification | Tonnes | Grade | Contained Metal | ||||
Mass (kt) | Silver (g/t) | Gold (g/t) | AgEq (g/t) | Silver (koz) | Gold (koz) | AgEq (koz) | |
Proven | 158 | 57 | 2.63 | 266 | 290 | 13.4 | 1,357 |
Probable | 376 | 73 | 2.41 | 265 | 878 | 29.2 | 3,199 |
Proven + Probable | 534 | 101 | 2.8 | 326 | 1,168 | 42.6 | 4,556 |
Notes:
- Cut-Off Grades: 149 g/t silver equivalent for San Miguel, 149 g/t silver equivalent for La Luz, 151 g/t silver equivalent for Lucero and 157 g/t silver equivalent for Belen
- Minimum Mining Width: 0.8 m.
- Cut and Fill Stope Size: 7m W x 4m H
- Long Hole Stope Size: 7m W x 20m H
- External Dilution Cut and Fill: 24%
- External Dilution Long Hole: 40%
- Gold Price: US
$1,735 /oz Silver Price : US$21.80 /oz- Gold Recovery: 90.1%
- Silver Recovery: 85.7%
- Dilution factors averaged 37.14%. Dilution factors are calculated based on internal stope dilution calculations and external dilution factors of 24% for cut and fill and 40% for long hole.
- Silver equivalents are based on a 79.6:1 silver:gold ratio.
- Figures in table are rounded to reflect estimate precision; small differences generated by rounding are not material to estimates.
Reconciliation to Previously Disclosed Mineral Resource and Mineral Reserve Estimates
The following table compares the current mineral resource and mineral reserve estimates to those previously disclosed by the Company (see news release dated
Silver-Gold Proven and Probable Reserves | |||||||||||||||
| Tonnes (000s) | Ag (g/t) | Au (g/t) | Ag Eq (g/t) | Ag (koz) | Au (koz) | Ag Eq (koz) | ||||||||
Proven | |||||||||||||||
Guanaceví ( | 141 | 319 | 0.82 | 385 | 1,445 | 3.7 | 1,742 | ||||||||
Guanaceví ( | 163 | 543 | 1.31 | 648 | 2,841 | 6.9 | 3,390 | ||||||||
Difference (%) | 16% | 70% | 60% | 68% | 97% | 86% | 95% | ||||||||
Bolañitos ( | 76 | 34 | 2.62 | 243 | 83 | 6.4 | 596 | ||||||||
Bolañitos ( | 158 | 57 | 2.63 | 266 | 290 | 13.4 | 1,357 | ||||||||
Difference (%) | 107% | 68% | 1% | 9% | 249% | 109% | 128% | ||||||||
Probable | |||||||||||||||
Guanaceví ( | 948 | 346 | 0.95 | 422 | 10,554 | 28.8 | 12,859 | ||||||||
Guanaceví ( | 1,097 | 466 | 1.11 | 555 | 16,445 | 39.0 | 19,579 | ||||||||
Difference (%) | 16% | 35% | 17% | 32% | 56% | 35% | 52% | ||||||||
Bolañitos ( | 237 | 53 | 2.51 | 254 | 405 | 19.1 | 1,930 | ||||||||
Bolañitos ( | 376 | 73 | 2.41 | 265 | 878 | 29.2 | 3,199 | ||||||||
Difference (%) | 59% | 37% | -4% | 4% | 117% | 53% | 66% | ||||||||
Silver-Gold Measured and Indicated Resources | |||||||||||||||
| Tonnes (000s) | Ag (g/t) | Au (g/t) | Ag Eq (g/t) | Ag (koz) | Au (koz) | Ag Eq (koz) | ||||||||
Measured | |||||||||||||||
Guanaceví ( | 95 | 405 | 0.88 | 475 | 1,240 | 2.7 | 1,456 | ||||||||
Guanaceví ( | 139 | 569 | 1 | 670 | 2,538 | 6 | 2,992 | ||||||||
Difference (%) | 46% | 41% | 59% | 41% | 105% | 127% | 106% | ||||||||
Bolañitos ( | 35 | 76 | 2.37 | 265 | 85 | 2.6 | 296 | ||||||||
Bolañitos ( | 42 | 97 | 3 | 322 | 131 | 4 | 435 | ||||||||
Difference (%) | 21% | 28% | 27% | 21% | 55% | 51% | 47% | ||||||||
Indicated | |||||||||||||||
Guanaceví ( | 566 | 363 | 0.82 | 428 | 6,603 | 14.9 | 7,797 | ||||||||
Guanaceví ( | 576 | 443 | 1 | 528 | 8,197 | 21 | 9,770 | ||||||||
Difference (%) | 2% | 22% | 34% | 23% | 24% | 41% | 25% | ||||||||
Bolañitos ( | 193 | 105 | 2.67 | 319 | 654 | 16.5 | 1,976 | ||||||||
Bolañitos ( | 412 | 111 | 2 | 279 | 1,470 | 30 | 3,697 | ||||||||
Difference (%) | 113% | 5% | -14% | -12% | 125% | 82% | 87% | ||||||||
Silver-Gold Inferred Resources | |||||||||||||||
Tonnes (000s) | Ag (g/t) | Au (g/t) | Ag Eq (g/t) | Ag (koz) | Au (koz) | Ag Eq (koz) | |||||||||
Inferred | |||||||||||||||
Guanaceví ( | 866 | 495 | 1.18 | 589 | 13,765 | 32.7 | 16,384 | ||||||||
Guanaceví ( | 839 | 416 | 1 | 487 | 11,225 | 25 | 13,132 | ||||||||
Difference (%) | -3% | -16% | -23% | -17% | -18% | -24% | -20% | ||||||||
Bolañitos ( | 311 | 80 | 2.82 | 305 | 798 | 28.2 | 3,054 | ||||||||
Bolañitos ( | 1,657 | 141 | 3 | 331 | 7,494 | 132 | 17,608 | ||||||||
Difference (%) | 433% | 77% | -11% | 8% | 839% | 369% | 477% |
National Instrument 43-101 Disclosure
The 2022 Guanacevi Report and the 2022 Bolañitos Report were co-authored by
The Technical Reports are available for download under the Company's profile on SEDAR at www.sedar.com and on the Company's website at www.edrsilver.com, and will be filed on EDGAR as soon as practicable at www.sec.gov. There are no differences in the Technical Reports from the information disclosed in this News Release.
About
Endeavour is a mid-tier precious metals mining company that operates two high-grade, underground silver-gold mines in
SOURCE
Contact Information
Tel: (604) 685-9775
Email: gmeleger@edrsilver.com
Website: www.edrsilver.com
Follow
Cautionary Note Regarding Forward-Looking Statements
This news release contains “forward-looking statements” within the meaning of
Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, production levels, performance or achievements of Endeavour and its operations to be materially different from those expressed or implied by such statements. Such factors include but are not limited to the ultimate impact of the COVID 19 pandemic on operations and results, changes in production and costs guidance, national and local governments, legislation, taxation, controls, regulations and political or economic developments in
Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to: the continued operation of the Company’s mining operations, no material adverse change in the market price of commodities, mining operations will operate and the mining products will be completed in accordance with management’s expectations and achieve their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or information, there may be other factors that cause results to be materially different from those anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.
Source:
2023 GlobeNewswire, Inc., source