Dilip Buildcon Limited announced that the company has received letter of acceptance in the tender floated by South Eastern Coalfields Lenited (SECL), for removal of over burden in the State of Madhya Pradesh. Hiring of HEMM and allied equipments for over burden removal, loading in to tippers, transportation & unloading of excavated materials & silt, dumping, dozing, scrapping /removal of all bands, preparation/maintenance of haul road, water sprinkling and spreading of excavated material at the site shown & levelling dumps as per direction of the management/engineer-in-charge for a period of 1795 days at Amadand OCP, Jamuna Kotma Area. Contract Value: INR 26,830.2 million.
Market Closed -
Other stock markets
|
5-day change | 1st Jan Change | ||
535.1 INR | +0.15% |
|
-1.14% | +39.11% |
EPS Revisions
1st Jan change | Capi. | |
---|---|---|
+0.40% | 9.04B | |
+64.52% | 4.94B | |
+39.19% | 3.78B | |
+29.80% | 2.98B | |
+50.74% | 2B | |
0.00% | 1.31B | |
-9.04% | 1.1B | |
+8.02% | 912M | |
-15.08% | 716M |
- Stock Market
- Equities
- DBL Stock
- DBL Stock
- News Dilip Buildcon Limited
- Dilip Buildcon Limited Receives Letter of Acceptance for OB Removal Contract Mining Work for Amadand OCP, Jamuna Kotma Area by South Eastern Coalfield Limited