Bold Ventures Inc. reported that its initial diamond drill program at the Traxxin Gold Project east of Atikokan, Ontario, has been completed. Four NQ diameter holes, designed to test the Main Zone, were drilled. Bold’s geological team is satisfied that the structure controlling the gold mineralization present in the historical drilling (2017/2018) was tested for the purposes of this program. Three of the holes appear to have intersected the Main Zone structure below the historical drilling at a vertical depth from 150 m to 200 m. The fourth hole (BV-21-01) intersected the zone at a vertical depth of approximately 80 m. This is based on visual observations only and does not indicate the gold content. Each hole has been logged and sampled. All samples have been sent for gold analysis and the results will be disclosed when received from the assay lab. Information gathered from this diamond drilling program will be used to review the depth potential and mineralizing controls in the Main Zone. Previous drilling in the Main Zone has traced a gold-bearing structure over 300 m in strike length hosting a well-defined, sheared, quartz vein surface exposure from 15 to 30 m wide. Of the previous eighteen diamond drill holes completed at the Traxxin Main Zone, only 2 holes penetrated depths in excess of 150 m (BED-17-017 and BED-18-022). The zone remains open in all directions.