Armadale announced positive results from test work completed on a bulk sample from the Mahenge Liandu Graphite Project in Tanzania (‘Mahenge Liandu’). The results include 5.5kg of high purity graphite concentrate produced from a 30kg bulk sample which was representative of a larger 187.7kg sample from Mahenge Liandu; Excellent flake distributions confirmed with 48.2% in the high value Large, Jumbo and Super Jumbo categories; Very high purity achieved averaging 98.2% Total Graphitic Content (‘TGC’); Concentrate will be used for further downstream test work and for samples to be sent to prospective off-take partners; JORC Resource modelling is ongoing and expected to be completed in January 2018; Drilling and Resource modelling is focused on upgrading the current Resource Category from Inferred to Indicated to support feasibility studies; An RC drilling programme aimed at significantly increasing the size of the deposit is planned for Second Quarter 2018; Feasibility study to commence in 2018, directly following completion of the scoping study in early 2018, with the objective of reaching a decision to mine in the near term.