Alio Gold Inc. provided the final set of drill results from its surface drill program at its 100%-owned Ana Paula project in Guerrero, Mexico. The 3,800 metre surface diamond drill program was initiated in January 2018 and consisted of six drill holes of 600 to 700 metres each targeting the complex breccia extension below the proposed open-pit. Additionally, two 300 metre surface holes were drilled into the near surface hydrothermal breccia to test its southern extension. The three final holes from the surface drill program (AP-18-286, AP-18-287 and AP-18-288) and one of the two additional holes (AP-18-290) returned positive results from the near surface hydrothermal breccia south of the proposed pit and on the southern edge of the alteration halo. The three surface holes (AP-18-286, AP-18-287 and AP-18-288) also intersected the complex breccia below the proposed pit.