Highlights:

• Infill program at Três Estradas was completed with 18 holes drilled:

TED-15-067 returned 61.30m @ 5.82% P2O5 (from 16.0m) including 16.0m @ 10.39% P2O5 (from 17.0m)
TED-15-070 returned 51.90m @ 6.83% P2O5 (from 1.85m)

• Joca Tavares drilling program was completed with 40 holes drilled:

JTD-15-012 returned 67.60m @ 4.44% P2O5 (from surface)
JTD-15-019 returned 7.57m @ 11.25% P2O5, (from surface)
JTD-15-028 returned 18.57m @ 4.53% P2O5 (from surface)
JTD-15-029 returned 17.42m @ 4.39% P2O5 (from surface)

• Três Estradas drill program results to increase current Indicated Resource (currently a JORC compliant 70.1 Mt comprised of 15.2 Mt Indicated & 54.9 Mt Inferred) for the BFS

• Maiden JORC compliant resource now being prepared for Joca Tavares

• Drilling success at Joca Tavares validates AGR's strategy of identifying higher grade oxide mineralisation to enhance Três Estradas mine plan

• Project development works advancing to schedule - column flotation test work to commence shortly and EIA on track for submission next quarter

Aguia Resources Limited issued this content on 27 January 2016 and is solely responsible for the information contained herein. Distributed by Public, unedited and unaltered, on 27 January 2016 17:22:20 UTC

Original Document: http://aguiaresources.com.au/2016/01/28/drilling-program-at-tres-estradas-and-joca-tavares-deposits-delivers-positive-results-to-further-strengthen-rio-grande-asset-base/