ACWA Power Co. announced the start of operation for the Phase 1 CSP Parabolic Trough (“PT”) 200 MW Unit of Noor Energy 1 P.S.C which is part of 950 MW Solar CSP Independent Power Project, Phase IV of the MBR Solar Park located in the Emirate of Dubai, UAE. Total capacity under operation reaches to 417 MW.
ACWA POWER owns a net stake of 25% in Noor Energy 1 P.S.C.