PREFEASIBILITY STUDY - COMPLETION OF METALLURGICAL TESTWORK AND PROCESS DESIGNDiatreme Resources Limited is pleased to announce the receipt of independent laboratory results for metallurgical studies and mineral processing designs undertaken as part of the Cyclone Project Prefeasibility Study.
The Company's primary objectives in undertaking the testwork were to:
ƒ Produce a very high grade Heavy Mineral ("HM") concentrate through a wet concentrator process.
ƒ Maximise the recovery of Zircon (the major valuable mineral component of the Cyclone Resource), and
ƒ Develop process flowsheets to be used in engineering designs for the wet and dry HM processing plants.
Testwork on a seven (7) tonne bulk sample has been conducted by CPG Resources - Mineral Technologies over the past year. Key outcomes from the metallurgical testing include:
ƒ The wet concentrator testwork produced a high grade HM concentrate (97.8% HM) utilizing conventional mineral sand separation technology.
ƒ The estimated distribution of zircon from the bulk sample to the wet concentrator process HM concentrate is 95.3%.
ƒ The estimated distribution of zircon from the HM concentrate to the mineral separation plant final Zircon product is 85.0%.
• A mineral separation process has been designed to produce Zircon and two titanium products, HiTi87 (86.6% TiO2) and HiTi67 (67.3% TiO2).
• The testwork has identified that conventional "off the shelf" technology can be used in the mineral processing at Cyclone.
Diatreme Resources is an Australian based diversified mineral explorer with significant projects in heavy mineral sands, copper, base metals and gold.
The Company owns the world class Cyclone Zircon Deposit in Western Australia, situated within the recognised Eucla Basin province, along with extensive areas of underexplored ground prospective for heavy mineral sands.
The Board and senior personnel exhibit wide experience, ranging through the exploration and development phases of resource management.
Australian Securities Exchange
Codes: DRX and DRXO
Securities
Ordinary shares (DRX):
354,597,423
Listed 15c options (30/09/13)(DRXO):
88,650,039
Board of Directors
Executive:
Tony Fawdon - Chairman/CEO David Hall - Operations Non-executive:
George White
Andrew Tsang William Wang Neil McIntyre
Joint Company Secretaries:
Leni Stanley
Tuan Do
Key Projects:
• Eucla Basin Cyclone Zircon Project
• Clermont Copper Project
• Anabama Copper Project
• Gilbert River Base Metals Project
Diatreme Resources Contact:
Tony Fawdon
Executive Chairman/CEO Phone: +61 7 3832 5666
Fax: +61 7 3832 5300
Share Registry:
Link Market Services
Level 15, ANZ Building
324 Queen Street, Brisbane, Q4000
DIATREME RESOURCES LIMITED ABN 33 061 267 061
Level 2, 87 Wickham Terrace, Spring Hill, Qld, 4000
PO Box 10288 Brisbane Adelaide Street Qld 4000
Telephone : +61 7 3832 5666 Facsimile : +61 7 3832 5300
manager@diatreme.com.au www.diatreme.com.au
Page 1 of 6
DIATREME RESOURCES LIMITED
"The Company is very encouraged by the results of the Cyclone Prefeasibility Study metallurgical and process design testwork."
"The three lines of final heavy mineral product selected, being zircon and two high to medium grade titanium products, are of a quality which augers well for attractive market pricing."
"Finalisation of the PFS bulk sample testing has improved Diatreme's understanding and requirements for progressing the Cyclone Zircon Project. It is expected that the maiden ore reserve estimate for Cyclone will be available in the near future, placing the Company in a commanding position to advance the project forward."
"Bulk sampling and current metallurgical testwork has taken eight months to complete and is expected to form an important cornerstone of information for the Definitive Feasibility Study. The Company is very satisfied with the results and the sound work that went into achieving the outcomes."
"Diatreme is now working diligently toward finalisation of the Prefeasibility Study, planned for release in late
February."
Please direct enquiries to:
Tony Fawdon David Hall
Executive Chairman/CEO Executive Director - Operations
Ph: 07 3832 5666 Ph: 07 3832 5666
Email : manager@diatreme.com.au
For further information on the Company visit www.diatreme.com.au
About Diatreme Resources
Diatreme Resources Limited (ASX code: DRX) is a diversified Australian mineral explorer with significant projects in heavy mineral sands, copper, base metals and gold. The Company is seeking to develop a mining operation at its Cyclone Zircon Project located within Western Australia.
About Zircon
Zircon is a mineral sand used in the production of ceramics, including sanitary ware, tiles and tableware. It is also used in refractories, TV glass and foundry applications. Zircon is the source material for zirconia and a range of chemicals used in
high-tech applications, including fuel cells and abrasives. Zirconium metal is used in nuclear fuel rods, while zirconia is
used in jewellery.
Page 2 of 6
DIATREME RESOURCES LIMITED
Attachment to Diatreme Resources Limited ASX release entitled "CYCLONE ZIRCON PROJECT PREFEASIBILITY STUDY - COMPLETION OF METALLURGICAL TESTWORK AND PROCESS DESIGN" dated 30 January 2012
TECHNICAL DETAILS SUMMARY OF METALLURGICAL TESTWORK RESULTSMINERAL PRODUCTS
CPG Resources - Mineral Technologies ("CPG") was engaged to
conduct processing testwork on a seven (7) tonne
representative bulk sample from the Cyclone Deposit. The
testwork is now complete and reports produced by CPG include
details of processing the bulk sample, flowsheet design,
specifications for products, and mineral recovery
estimates.
The Cyclone Project is expected to produce three mineral
products with estimated average annual quantities based on a
mining rate of 10 million tonne per year as shown in the
following tables. The production rate estimates are based on
mineral distributions from the bulk sample to final products
and allow for the difference in bulk sample grade and
resource model estimated grade for the sample. Chemical assay
specifications for the products are also shown in the tables.
Zircon: 65,000 tonnes per year
ZrO2 % | FE2O3 % | SiO2 % | Al2O3 % | TiO2 % | P2O5 % | U+Th ppm | CeO2 % |
66.0 | 0.10 | 32.8 | 0.20 | 0.31 | 0.07 | 369 | 0.020 |
HiTi87: 10,000 tonnes per year
TiO2 % | FE2O3 % | SiO2 % | Al2O3 % | ZrO2 % | MgO % | MnO % | CaO % | CR2O3 % | U+Th ppm |
86.6 | 2.6 | 5.0 | 1.01 | 3.3 | 0.04 | 0.02 | 0.03 | 0.06 | 84 |
HiTi67: 46,000 tonnes per year
TiO2 % | FE2O3 % | SiO2 % | Al2O3 % | ZrO2 % | MgO % | MnO % | CaO % | CR2O3 % | U+Th ppm |
67.3 | 20.1 | 6.3 | 1.75 | 0.5 | 0.10 | 0.42 | 0.07 | 0.08 | 94 |
Testwork demonstrated that up to 2,000 tonnes per year of rutile could be produced but the variability of rutile grade in the resource and a desire to reduce the complexity of the mineral separation process has resulted in a decision to produce a non-magnetic HiTi (HiTi87) product which includes all rutile that will be recovered. This HiTi product has a chemical assay of 86.6% TiO2.
MINERAL RECOVERY
Mineral recoveries have been estimated from mineral distributions using:
• Quantitative Evaluation of Minerals by Scanning Electron Microscopy ("QEMSCAN®") and chemical analysis of the bulk sample.
• Analysis of concentrate produced from the Wet Concentrator Plant ("WCP") gravity concentration process tests.
• Analysis of final products produced from the Mineral Separation Plant ("MSP") process tests.
• Process simulation and back-calculation of feed grades
The estimated mineral distributions from WCP feed (bulk sample) to WCP HM concentrate are:
• Zircon | 95.3% |
• Rutile | 75.3% |
• Leucoxene | 36.4% |
• HiTi | 29.8% |
• Altered Ilmenite | 68.0% |
• SiTiOx | 36.7% |
Page 3 of 6
DIATREME RESOURCES LIMITED
These mineral distributions have been estimated from
simulated flows and QEMSCAN® particle classifications.
Altered Ilmenite distribution has been estimated to be
similar to the total heavy mineral ("HM") distribution
(68.0%).
The estimated Zircon mineral distribution from WCP HM
concentrate to Zircon product from the MSP is 85%. There are
five titanium minerals of significance that report in various
quantities to the two HiTi products. The
main minerals that are recovered to HiTi87 are Rutile,
Leucoxene, HiTi, and SiTiOx and the main minerals that report
to HiTi67 are Leucoxene, HiTi, Altered Ilmenite, and SiTiOx.
The table below shows the estimated percent distribution of
the five titanium minerals from WCP HM concentrate to the two
HiTi mineral products.
Rutile % | Leucoxene % | HiTi % | Altered Ilmenite % | SiTiOx % | |
HiTi87 | 86.1 | 35.7 | 3.2 | - | 6.7 |
HiTi67 | - | 40.5 | 63.7 | 89.0 | 82.1 |
Mineral distributions to products from MSP feed
The total estimated mineral recovery from the bulk sample to final products including these mineral distributions in the WCP and MSP, and inclusion of other minor minerals that are recovered to the products is shown in the following table. Minor minerals account for approximately 1% of the Zircon product, 3% of the HiTi87 product and 2% of the HiTi67 mineral products.
Zircon % | Rutile % | Leucoxene % | HiTi % | Altered Ilmenite % | SiTiOx % | |
Zircon | 81.8 | - | - | - | - | - |
HiTi87 | - | 66.8 | 13.4 | 1.0 | - | 2.6 |
HiTi67 | - | - | 15.0 | 19.4 | 61.7 | 30.7 |
Recovery of WCP feed to products
Testwork and process simulation produced a range of possible
Zircon recoveries dependent on the analytical method used,
due to variations in chemical assays, QEMSCAN® mineral
classification, and back calculated feed comparisons. The
Zircon recovery reported here is at the top end of the
estimated range (75.4% to
81.8%). The variation in estimated mineral distribution for
Altered Ilmenite to HiTi67 was 2.2% and the variation in
Rutile distribution to HiTi87 was 9.6%.
The top end of the ranges for recoveries have been used for
all minerals for the following reasons:
• The upper part of the dune sample was found to contain a high proportion of coated and stained minerals. This bulk sample material was found to be more difficult to process and consequently a decision made to exclude it from the mine plan, indicating potential for improved process performance.
• The grade of the bulk sample, estimated from drilling and the resource model, is lower than the CPG
measured grade, indicating potential for the current resource estimate to be conservative.
• This testwork has been based on one representative bulk sample and future testwork will use several bulk samples to optimise the process for the feed variability in distinct areas of the resource.
BULK SAMPLE
The bulk sample used in the metallurgical testwork was collected from drill holes across the area of the Cyclone mineralisation that has been estimated suitable for mining. The bulk sample was initially prepared as three separate bulk samples representing the three geological zones (dune, beach, and nearshore). The following table is a summary of the details of the three samples including mass, HM%, oversize, average particle size for the sand portion less than 2 millimetres, and slimes (-38 micron).
Mass (kg) | HM % | Oversize % (+2mm) | Particle size (micron) | Slimes % | |
Dune | 2,235 | 2.14 | 16.6 | 220 | 4.17 |
Beach | 3,792 | 3.50 | 3.3 | 220 | 1.61 |
Nearshore | 948 | 2.12 | 8.8 | 149 | 3.22 |
Total (average) | 6,975 | 2.88 | 6.9 | 197 | 2.66 |
Bulk sample details
Page 4 of 6
DIATREME RESOURCES LIMITED
The average bulk sample grade at 2.88% HM is higher than the
grade of 2.49% HM that was estimated using Diatreme's normal
resource data collection procedures. This is a positive
outcome as the resource estimation methodology could be
conservative and the difference requires further
investigation. All zones are low in slimes and dune is
significantly higher in oversize. HM% and particle size are
in the normal range expected for mineral sand processing.
Before undergoing processing testwork, sub samples were taken
from the three bulk samples and subjected to additional
characterisation tests to understand the processing
variability of the samples and to identify any issues with
the samples that could arise during processing testwork. The
samples were processed on a shaking table to produce HM
concentrate, and the concentrates were subjected to magnetic
fractionation and then separated in heavy liquid with a
density of 4.05 specific gravity ("SG") to check potential
variability in recovery of Zircon.
The results of the bulk samples characterisation tests
demonstrated that 17% of the HM in the samples reported to
the table tailings fraction. This is due to the relatively
large component of low value light titanium minerals in the
samples which are not considered economic to extract. Zircon
recovered very well to concentrate and made up 94.3% of the
+4.05SG fraction. All magnetic fractions and SG fractions
were inspected under a microscope confirming the presence of
coated and stained minerals, and significant proportions of
altered ilmenite and leucoxene grains. This information was
used for planning the processing testwork.
The results of the bulk sample characterisation tests
demonstrated that although there would be some benefits in
processing the zones separately, the added complexity in
processing and mining resulted in a decision to combine the
three samples for detailed metallurgical testwork and process
design. The primary objectives for the metallurgical testwork
were to maximise the recovery of Zircon and to maximise the
WCP HM concentrate grade. The characterisation tests
demonstrated these objectives could be achieved from the
combined bulk sample giving due consideration to mineral
concentration and separation issues associated with a high
proportion of stained and coated minerals and low SG titanium
minerals.
WET CONCENTRATOR PLANT
The combined bulk sample was screened at 3mm prior to
commencing WCP spiral testwork. The first stage of gravity
concentration used MG6.3 spirals as the rougher spirals
operating at 1.6tph and 2.0tph. Release Curves were developed
to provide a predictive tool characterising the separation
performance of the prepared sample. The tests indicated that
Zircon in the sample readily responded to gravity separation
using spirals, and titanium minerals were less efficiently
separated due to a high proportion of lower SG Ti minerals.
The middlings stream from the rougher spirals was also tested
on MG6.3 spirals.
The concentrate from the rougher and mid scavenger spirals
was screened at 1mm to prevent coarse sand becoming a problem
with recirculating streams, and the oversize was rejected.
The remaining -1mm sand was processed using HG10i spirals at
1.5tph and 1.8tph to generate separation data for the cleaner
stage. The lower feed rate produced better performance. HG10i
spirals were also used for re-cleaner stage tests which
indicated an additional finishing stage would be required to
upgrade the concentrate to a high HM grade with high Zircon
recovery.
Finisher stage testwork involved HG10i and WW6 spirals, WHIMS
and an up current classifier ("UCC"). The UCC tests produced
superior performance with the underflow containing more than
80% of the stage feed HM and a grade exceeding 97% HM. The
UCC overflow was then processed using HG10i spirals and
shaking tables to produce a final concentrate from the fine
sand fraction. The table concentrate grade was in excess of
98% with a stage recovery of 98% Zircon.
Performance simulation of the WCP was conducted using data
generated from the testwork. Small variations were noted for
modelled intermediate stream data. The simulation results
indicated a HMC containing 97.8% HM would be produced at a
rate of 25.9tph for a plant feed rate of 1300tph. Total HM
recovery would be in the order of +65% from the plant feed
while VHM recovery of +90% was achievable. Notable from the
testwork was a lower ZrO2 recovery compared to
VHM recovery indicating that some ZrO2 losses
were due to composite minerals with ZrO2
attachments or inclusions rather than free or liberated
zircon.
MINERAL SEPARATION PLANT
The concentrate produced from the WCP testwork was screened at 425 microns before being subjected to MSP processing tests. Selected process streams that were generated throughout the initial testwork were examined and retested as necessary to improve product recoveries and quality.
Page 5 of 6
DIATREME RESOURCES LIMITED
An altered ilmenite rich stream was produced using
electrostatic and rare earth roll ("RER") magnetic
separators. This magnetic stream was of suitable quality for
the HiTi67 product.
The non-magnetic stream from the RER was processed through
magnetic and electrostatic separators to produce a rutile
pre-concentrate. Additional gravity, magnetic, and
electrostatic processes were used to produce a rutile
product. Due to the low rutile production rate and the
variability of rutile grade in the resource a decision has
been made to reduce the complexity of the process and produce
a rutile pre-concentrate (HiTi) which includes all rutile
recovered from the feed. This stream is of suitable quality
for the HiTi87 product.
The electrostatic and magnetic separations performed on the
HM concentrate generated a non-conductor stream that was
processed for recovery of zircon using a combination of wet
and dry processes. A hot acid leach ("HAL") process was used
to clean surface coatings and staining from the feed to the
zircon process. The HAL process improved both the efficiency
of the zircon separation and the product quality. A
relatively complex middling circuit was necessary to achieve
elevated recovery of Zircon due to the complexity and range
of titanium minerals with low magnetic and low conducting
properties.
The HiTi87 product has a SiO2 assay of 5.0% and
the HiTi67 product has a SiO2 assay of 6.3%. The
high SiO2 content of the HiTi products is due to
the presence of silica bearing titanium minerals and not free
silica. The Zircon product has an assay of 0.3%
TiO2 which ranks it as standard grade Zircon.
Combined uranium and thorium in the Zircon product is 369 ppm
and this has been identified as a positive aspect for
marketing.
--oOo--
Page 6 of 6
distribué par | Ce noodl a été diffusé par Diatreme Resources Limited et initialement mise en ligne sur le site http://www.diatreme.com.au. La version originale est disponible ici. Ce noodl a été distribué par noodls dans son format d'origine et sans modification sur 2012-01-31 17:57:05 PM et restera accessible depuis ce lien permanent. Cette annonce est protégée par les règles du droit d'auteur et toute autre loi applicable, et son propriétaire est seul responsable de sa véracité et de son originalité. |