Jiulian Resources Inc. announced that survey which was recently completed on the company's Big Kidd Project, located near Merritt, British Columbia. The survey was completed by SJ Geophysics Ltd., based out of Delta, BC. The IP survey successfully delineated a chargeability anomaly at surface, which is strongly coincident with the copper-gold mineralization intersected by historic 1 drilling on the Big Kidd Breccia Zone. More significant is a much larger and extremely strong chargeability anomaly located down dip of the historic 1 drilling. This new anomaly, termed the "Big Brother Zone", measures approximately 1 kilometer in length by 500 meters in width and remains open below the 600 meter depth of the survey. The Big Brother Zone now increases the size of the Company's drill target area to 1.35 km in length by 700 meters in width. Figures accompanying this news release, including a plan map showing the location of the IP lines relative to the BK Breccia Zone, cross-section line 5300N through the northern margin of the BK Breccia Zone, and a 3D flyby of the historic 1 drilling and the new 2019 IP chargeability results can be found on the company's website. Construction of core logging and cutting infrastructure at a warehouse facility in West Kelowna, BC, is quickly progressing and is anticipated to be completed shortly. The company is scheduled to commence their phase I, 4000m diamond drilling program on February 2, 2019.