Canadian Copper Inc. announced positive drilling results from its next thirteen drill holes at the Chester Copper Project (Chester) located in the Bathurst Mining Camp, New Brunswick, Canada. Drilling program highlights: Hole C21-23: 6.16 % Cu over 2 meters in a continuous mineralized envelope grading 0.39% Cu over 111 meter starting 10 meters below surface; Hole C21-26: 0.73% Cu, 4% Zn, 0.11 gpt Au, 18.84 gpt Ag over 13 meters in a continuous mineralized envelope grading 0.41% Cu over 25.25 meters starting 10 meters from surface; Hole C21-28: 1.16% Cu over 9.85 meters including 3.82% Cu over 2 meters.
Market Closed -
Other stock markets
|
5-day change | 1st Jan Change | ||
0.08 CAD | -5.88% | -5.88% | -5.88% |
1st Jan change | Capi. | |
---|---|---|
-5.88% | 5.62M | |
+76.34% | 51.04B | |
+29.26% | 27.09B | |
+76.50% | 11.62B | |
+23.84% | 7.66B | |
+19.23% | 6.98B | |
+10.37% | 6.46B | |
+61.24% | 5.66B | |
+19.33% | 3.77B | |
+80.38% | 3.76B |
- Stock Market
- Equities
- CCI Stock
- News Canadian Copper Inc.
- Canadian Copper Inc. Reports Near-Surface Intercept of 6.16% Cu over 2 Meters Within 0.39% over 111 Meters At the Chester Copper Project